- Joined
- Jan 20, 2024
- Threads
- 1
- Messages
- 11
- Reaction score
- 8
- Location
- Mississippi
- Vehicle(s)
- Maverick Hybrid
- Engine
- 2.5L Hybrid
- Thread starter
- #1
I have a new baby on the way, my wife’s due date is March 14. My XLT Hybrid is scheduled to be built February 5th. Which one do you think I get to hold first?
Details: This is our second child, our first came the day after her due date. This one is another girl, and we don’t plan to induce. The truck is a Cactus Gray Hybrid XLT Lux with CP360. I live in North MS.
Details: This is our second child, our first came the day after her due date. This one is another girl, and we don’t plan to induce. The truck is a Cactus Gray Hybrid XLT Lux with CP360. I live in North MS.
Sponsored