Production Purgatory

n0maverick

2.5L Hybrid
Well-known member
Joined
Dec 27, 2021
Threads
0
Messages
326
Reaction score
466
Location
MidMO
Vehicle(s)
2022 Tiguan, 2022 Maverick, 2013 Escape
Engine
2.5L Hybrid
no railcar yet for me. but is there waiting. same dates 6/2-6/8 delivery. eactly when ill be mexico in a sad unfortunate flip with my truck. but reading kc convoy delays im sure it will arrive after.
Surprisingly the railcar trace is estimating 5/19 for KC railyard delivery. Skeptical about that. 1 week from mexico to MO?
Well , this is new- says 5/13/22 under the 'In Production'.... build week was 5/9.
I'm 10/2339 on the Sticker

Screenshot (10).png
tomorrow built will show the same date
Sponsored

 

Ala

2.0L EcoBoost
Active member
First Name
Phil
Joined
Sep 17, 2021
Threads
0
Messages
29
Reaction score
24
Location
Georgia
Vehicle(s)
2013 F150
Engine
2.0L EcoBoost
My "in production" had a date of 5-12-22. Build week was 5-2-22. Today I now have the BCE modules but not the PCM.
I've got the exact same build week and now a week later the same build date. It is kind of confusing.
 

Scupking

2.5L Hybrid
Well-known member
First Name
Matt
Joined
Aug 13, 2021
Threads
14
Messages
1,362
Reaction score
1,590
Location
CT
Vehicle(s)
2022 Ford Maverick Hybrid
Engine
2.5L Hybrid
Mine still says in production since 5/4....
 
OP
OP
Wrench77

Wrench77

2.5L Hybrid
Well-known member
First Name
Brian
Joined
Jun 20, 2021
Threads
18
Messages
269
Reaction score
401
Location
New Hampshire
Vehicle(s)
Cadillac ATS, Ford Maverick pre ordered
Engine
2.5L Hybrid
Is it actually in production or just scheduled? What you posted just says scheduled. What was your scheduled production week?
March 9th week was what I was told by my dealer and Ford. My window sticker says March 4th but nothing since then. I have checked and no modules populated yet so who know. I’m just so glad at least it’s gotten this fa
 

Rickydragon

2.0L EcoBoost
Well-known member
Joined
Oct 29, 2021
Threads
8
Messages
171
Reaction score
191
Location
North America
Vehicle(s)
2.0 Eco AWD Lux Pack 4K Tow Shadow Black
Engine
2.0L EcoBoost
While my order tracker still has not changed from "In production", when I checked the modules this morning (5/14), there are many lines of data under the PCM and BCE now, so at least there is activity!
Screenshot (9).png
How do you check the modules?
 

Sponsored

ClemsonU88

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Feb 19, 2022
Threads
14
Messages
463
Reaction score
706
Location
NC
Vehicle(s)
2022 Ford Maverick; 2022 Ford Bronco Sport
Engine
2.5L Hybrid
I’m thrilled for you guys seeing progress!! They can’t do my #1437 truck until they do 1-1436. 😊

I’m in production but haven’t seen any progress other than the window sticker being generated. Hopefully this week will be good to all of us with a 5/9 build week.
 

ClemsonU88

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Feb 19, 2022
Threads
14
Messages
463
Reaction score
706
Location
NC
Vehicle(s)
2022 Ford Maverick; 2022 Ford Bronco Sport
Engine
2.5L Hybrid
Does anyone have a 5/16 build date and have a window sticker? How many are in your batch? There are 2312 in my batch, and I'm 1437. Does anyone else have 2312 in their batch? If so, what's your build date?

My build date was 5/9, but I've seen other people with a build date of 5/9 have a batch # of 2339. Maybe mine was bumped to 5/16 or 5/23, and no one told me.

Ford Maverick Production Purgatory 1652731325702
2339
 

FirstFord

2.5L Hybrid
Well-known member
Joined
Aug 2, 2021
Threads
3
Messages
687
Reaction score
1,329
Location
Massachusetts
Vehicle(s)
VW Jetta
Engine
2.5L Hybrid
Does anyone have a 5/16 build date and have a window sticker? How many are in your batch? There are 2312 in my batch, and I'm 1437. Does anyone else have 2312 in their batch? If so, what's your build date?

My build date was 5/9, but I've seen other people with a build date of 5/9 have a batch # of 2339. Maybe mine was bumped to 5/16 or 5/23, and no one told me.

1652731325702.png
2339
I had a 5/16 build week. Window sticker apparently created 5/11. Batch info below:

Ford Maverick Production Purgatory 1652734430229


Looks like a short week; only 1500 units. Doesn't match the 6/9 or 5/16 numbers you have
 
OP
OP
Wrench77

Wrench77

2.5L Hybrid
Well-known member
First Name
Brian
Joined
Jun 20, 2021
Threads
18
Messages
269
Reaction score
401
Location
New Hampshire
Vehicle(s)
Cadillac ATS, Ford Maverick pre ordered
Engine
2.5L Hybrid
I had a 5/16 build week. Window sticker apparently created 5/11. Batch info below:

1652734430229.png


Looks like a short week; only 1500 units. Doesn't match the 6/9 or 5/16 numbers you have
I had a build date of 5/9 but got the in production email on 5/4 and this is my batch number. Still no modules alive and no word yet on it being built
Ford Maverick Production Purgatory C50AAEBF-B77A-4C63-93F3-FB43120E6D8A
 
Sponsored

Nw_adventure

2.0L EcoBoost
Well-known member
Joined
Aug 3, 2021
Threads
86
Messages
2,593
Reaction score
2,225
Location
Salt Lake city
Vehicle(s)
Honda Element/ Toyota Highlander
Engine
2.0L EcoBoost
Looks like I am also now in production purgatory - Ugh
 

Nw_adventure

2.0L EcoBoost
Well-known member
Joined
Aug 3, 2021
Threads
86
Messages
2,593
Reaction score
2,225
Location
Salt Lake city
Vehicle(s)
Honda Element/ Toyota Highlander
Engine
2.0L EcoBoost
I had a 5/16 build week. Window sticker apparently created 5/11. Batch info below:

1652734430229.png


Looks like a short week; only 1500 units. Doesn't match the 6/9 or 5/16 numbers you have
My 5/9 build week also smaller @ 1685 units -
 

Wx Man

2.5L Hybrid
Well-known member
First Name
Hendricus
Joined
Aug 31, 2021
Threads
13
Messages
143
Reaction score
269
Location
Gray, Maine USA
Vehicle(s)
2007 Toyota FJ
Engine
2.5L Hybrid
Does anyone have a 5/16 build date and have a window sticker? How many are in your batch? There are 2312 in my batch, and I'm 1437. Does anyone else have 2312 in their batch? If so, what's your build date?

My build date was 5/9, but I've seen other people with a build date of 5/9 have a batch # of 2339. Maybe mine was bumped to 5/16 or 5/23, and no one told me.

1652731325702.png
2339
I have a 5/16 build week and am showing 115/619.
 
OP
OP
Wrench77

Wrench77

2.5L Hybrid
Well-known member
First Name
Brian
Joined
Jun 20, 2021
Threads
18
Messages
269
Reaction score
401
Location
New Hampshire
Vehicle(s)
Cadillac ATS, Ford Maverick pre ordered
Engine
2.5L Hybrid
Is that number really the build number. I thought it was but maybe not
 

Hdang1980

2.5L Hybrid
Well-known member
Joined
Aug 14, 2021
Threads
17
Messages
958
Reaction score
1,769
Location
Elk Grove, CA
Vehicle(s)
2022 Ford Maverick Hybrid
Engine
2.5L Hybrid
For reference, mine took 6 1/2 weeks from actual in production date 3/11 to delivery date 4/27. Might have taken a bit longer to reach me in Northern CA.