- Thread starter
- #1
Misery loves company.
I know the Hybrid group has been put in the great holding pattern in the sky. Apparently due to EPA verification. But what about those of you who have Ecoboosts that were scheduled and went into ‘Production’ status but have never moved beyond that.
I had a build date of 10/4 and went into ‘Production’ the week prior. Got my window sticker and have not seen any change since. No build date, No built date, No shipped Date, No ETA.
Just lost in Purgatory.
Anyone else out there with me?
I know the Hybrid group has been put in the great holding pattern in the sky. Apparently due to EPA verification. But what about those of you who have Ecoboosts that were scheduled and went into ‘Production’ status but have never moved beyond that.
I had a build date of 10/4 and went into ‘Production’ the week prior. Got my window sticker and have not seen any change since. No build date, No built date, No shipped Date, No ETA.
Just lost in Purgatory.
Anyone else out there with me?
Sponsored