- Thread starter
- #1
So I ordered a plain jane XLT tremor 9/20. Got a build email on 11/3 for 12/19. I just got an email being pushed back until 1/2
Anyone else pushed back?
Sponsored
I got a lariat Tremor +app pkg without moon roof and the 360 extra pkg. MSRP 36,400 no build date.I got a basic Tremor too. Im still pushing for a build date.![]()
Tremor must have shaken the assembly line.Mine has been in production for 2 weeks now. Not sure if that's normal or not.
ive been waiting on my 11/1/21 ordered Hybrid Lariat. I'm a seasoned vet lol. I thought ordering plain jane xlt (no lux, no copilot, no remote start, no bedliners) would save me from these hassles lolSo are you a first timer, or pro
Throughout production of the Maverick there have been a few people stuck "in production " up to 2 months worst case. Don't know if there is any average time, but anywhere between 2 weeks and 2 months would be the possible range.Mine has been in production for 2 weeks now. Not sure if that's normal or not.
What date was it previously?Mine got pushed to 1/2/23 for XLT Tremor.