Sponsored

January 3rd build week?

msmaz10

Well-known member
First Name
Michelle
Joined
Aug 12, 2021
Threads
0
Messages
52
Reaction score
59
Location
San Diego, CA
Vehicle(s)
2018 Audi Q5
There must be something - bed liner or other constrained part as you all mentioned - that is holding up all of our trucks that are otherwise 99% complete. Will let you know if/when my 2/1 estimated delivery date changes. I'm sure it will. Have a great weekend all! :)
Sponsored

 

Red Ryder

2.5L Hybrid
Well-known member
Joined
Jun 20, 2021
Threads
12
Messages
1,190
Reaction score
1,737
Location
United States (TN)
Vehicle(s)
22 Maverick XLT Iconic Silver
Engine
2.5L Hybrid
My ETA has not changed. Still 2-20. Produced 1-8, back from body company on 1-13. Still "in production." No built or shipped notice yet. I will reach out to my sales manager for an update next week to see if they can see something I cannot.
Similar to mine - "In Production" on 1-10, "Estimated Delivery" of 2-21, no built or shipped yet.
Dealer told me a few days after production date that it went to body company for SIBL. Nothing since.
I suspect that 2-21 date is becoming optimistic.
 

MathWiz16

Member
First Name
Ricardo
Joined
Oct 2, 2021
Threads
0
Messages
21
Reaction score
50
Location
Mission, Texas
Vehicle(s)
Toyota Camry
I just spoke to my dealer, they expect mine to be delivered next week sometime between the 26th and the 31st. It was shipped on Jan 10th. I really don’t think the SIBL is holding back the builds. My build was a Lariat Lux w/360 and the painted wheels with no other extras (which includes the SIBL).
 

Cad

2.5L Hybrid
Well-known member
Joined
Jul 15, 2021
Threads
4
Messages
104
Reaction score
201
Location
Mississippi
Vehicle(s)
2002 Ford Expedition
Engine
2.5L Hybrid
Still now word on mine. Still showing 1/10 in production. Mine is just the basic xl w/co pilot 360, hitch and spray in bed liner.
Bed liner seems to be a common link. 935/1535
 
Last edited:

Salty

Well-known member
Joined
Jun 20, 2021
Threads
1
Messages
48
Reaction score
83
Location
LV
Vehicle(s)
Maverick
Asked my dealer on Wed (1/19) to confirm the 1/24 delivery he told me a week ago was still planned. Never got a response, when I asked again today, was told the lady that's able to see that is gone and won't be back until Mon (1/24). I called the 800-334-4375 and was told that it's still "In production" with a 1/8 production date and ETA of 1/30. I haven't been able to get the tracker to work in a few days, but that's the last that I remember it being as well. Window sticker shows 1/18 at the bottom.

986/1535
Hybrid Lariat First Ed
360 co-pilot
SIBL
 

Sponsored

Warhouse

2.5L Hybrid
Member
First Name
Roger
Joined
Jan 20, 2022
Threads
0
Messages
13
Reaction score
7
Location
So CA
Vehicle(s)
Ford F150 Extended Crew - SOLD
Engine
2.5L Hybrid
Trucks invoiced from the factory after the 12/27 price increases will reflect that. If your order was placed before that then your dealership files at the time of the sale for the price protection adjustment.
Thanks! Make sense.
 

jwiedle24

2.5L Hybrid
Well-known member
Joined
Jun 16, 2021
Threads
5
Messages
343
Reaction score
531
Location
Ohio
Vehicle(s)
Lariat w/Luxury Pkg
Engine
2.5L Hybrid
Asked my dealer on Wed (1/19) to confirm the 1/24 delivery he told me a week ago was still planned. Never got a response, when I asked again today, was told the lady that's able to see that is gone and won't be back until Mon (1/24). I called the 800-334-4375 and was told that it's still "In production" with a 1/8 production date and ETA of 1/30. I haven't been able to get the tracker to work in a few days, but that's the last that I remember it being as well. Window sticker shows 1/18 at the bottom.

986/1535
Hybrid Lariat First Ed
360 co-pilot
SIBL

My tracker has been stuck on 1/11 production date. The very bottom of the page has showed an ETA of 2/18 since it was stamped in production.

Emailed my salesman this morning to see what he could see and he replied:

“My new update is showing delivery between 2/12-/2/18. At this time that is not set in stone but that's the ETA!”

Not a whole lot of help to the group, but just posting any update I get.
 

MathWiz16

Member
First Name
Ricardo
Joined
Oct 2, 2021
Threads
0
Messages
21
Reaction score
50
Location
Mission, Texas
Vehicle(s)
Toyota Camry
Update: Mine got delivered to the dealer today. A couple of days earlier than expected!!

Ford Maverick January 3rd build week? 628D5F76-BA3D-4AB2-9C1D-4961D465C13B
 

casanewt

Well-known member
Joined
Jul 22, 2021
Threads
9
Messages
465
Reaction score
658
Location
Cincinnati
Vehicle(s)
2023 KIA Sportage X-Line Prestige PHEV
Engine
Undecided
Update: Mine got delivered to the dealer today. A couple of days earlier than expected!!
Congrats! Was yours actually scheduled as a 1-3-22 build week?
 

MathWiz16

Member
First Name
Ricardo
Joined
Oct 2, 2021
Threads
0
Messages
21
Reaction score
50
Location
Mission, Texas
Vehicle(s)
Toyota Camry
Congrats! Was yours actually scheduled as a 1-3-22 build week?
Yes it was scheduled for the week of 01/03. It went into production 01/05, was built 01/07, and shipped 01/10.
 
Sponsored

msmaz10

Well-known member
First Name
Michelle
Joined
Aug 12, 2021
Threads
0
Messages
52
Reaction score
59
Location
San Diego, CA
Vehicle(s)
2018 Audi Q5
Received a built email yesterday - noon PST - saying that my truck will arrive at the local dealer sometime between 2/2 and 2/8. Tracker is now updated saying 2/8 delivery with 1/23 as the built date. Will let you all know when I get a "shipped" email.
 

Warhouse

2.5L Hybrid
Member
First Name
Roger
Joined
Jan 20, 2022
Threads
0
Messages
13
Reaction score
7
Location
So CA
Vehicle(s)
Ford F150 Extended Crew - SOLD
Engine
2.5L Hybrid
Received a built email yesterday - noon PST - saying that my truck will arrive at the local dealer sometime between 2/2 and 2/8. Tracker is now updated saying 2/8 delivery with 1/23 as the built date. Will let you all know when I get a "shipped" email.
Congrats! My order info is very similar to yours including order date. Dealer told me it was going into production today 1/24, but the tracking page has been in the "in production" stage for a 4 days now without an actual in production date. Hoping that will change soon!
 
Last edited:

bob_vic

Well-known member
First Name
Bob
Joined
Aug 31, 2021
Threads
12
Messages
137
Reaction score
194
Location
Philadelphia
Vehicle(s)
Maverick XLT
My scheduled build week was 1/3/22
My scheduled build day was 1/8/22 (Saturday)
My "In Production" date was 1/11/22 (Tuesday) -- so apparently just a couple of days behind
Do you have a date next "built" yet?
 

DryHeat

2.5L Hybrid
Well-known member
First Name
DryHeat
Joined
Aug 18, 2021
Threads
8
Messages
1,578
Reaction score
3,439
Location
Arizona
Vehicle(s)
Jeep Patriot
Engine
2.5L Hybrid
Do you have a date next "built" yet?
Not on the tracker. My Dealer tells me it is built and showed me this on the Vehicle History:
Ford Maverick January 3rd build week? 1643063457836

To me (and to him) that looks like it was "Produced" as of "Jan-11-2022."

It's supposed to show up within the next 10 days. We'll see...
Sponsored

 
 







Top