Sponsored

January 3rd build week?

2022EOW

2.5L Hybrid
Well-known member
First Name
Marty
Joined
Jun 26, 2021
Threads
4
Messages
605
Reaction score
1,039
Location
Missouri
Vehicle(s)
2014 Focus
Engine
2.5L Hybrid
Who all has there build scheduled for this coming week. Whichever day it happens, per my window sticker it is supposed to be 903 of 1535 on the line that day. Area 51, Hybrid, Lariat Lux, with floor liners and carpeted mats.
Sponsored

 

jwiedle24

2.5L Hybrid
Well-known member
Joined
Jun 16, 2021
Threads
5
Messages
342
Reaction score
527
Location
Ohio
Vehicle(s)
Lariat w/Luxury Pkg
Engine
2.5L Hybrid
Who all has there build scheduled for this coming week. Whichever day it happens, per my window sticker it is supposed to be 903 of 1535 on the line that day. Area 51, Hybrid, Lariat Lux, with floor liners and carpeted mats.
🙋🏻‍♂️I’m 952/1169 if that’s what that number actually indicates.

Did you receive anything besides an email saying you’re scheduled for week of 1/3? My tracker has shown in production since either Dec 23rd/24th.
 
OP
OP

2022EOW

2.5L Hybrid
Well-known member
First Name
Marty
Joined
Jun 26, 2021
Threads
4
Messages
605
Reaction score
1,039
Location
Missouri
Vehicle(s)
2014 Focus
Engine
2.5L Hybrid
🙋🏻‍♂️I’m 952/1169 if that’s what that number actually indicates.

Did you receive anything besides an email saying you’re scheduled for week of 1/3? My tracker has shown in production since either Dec 23rd/24th.
Nope. I was originally scheduled for 12/13, and finally got an e-mail on 12/24 indicating that it was moved to 1/3.
 

jwiedle24

2.5L Hybrid
Well-known member
Joined
Jun 16, 2021
Threads
5
Messages
342
Reaction score
527
Location
Ohio
Vehicle(s)
Lariat w/Luxury Pkg
Engine
2.5L Hybrid
Nope. I was originally scheduled for 12/13, and finally got an e-mail on 12/24 indicating that it was moved to 1/3.
Same. I was 12/13 via Ford email, then 12/20 via my salesperson, then 1/3 via Ford email I received on 12/26 (at least my salesperson informed me of this change on 12/15 when I asked for an update so I was prepped for it).

We should be in the clear now with in production and window sticker, right?
 
OP
OP

2022EOW

2.5L Hybrid
Well-known member
First Name
Marty
Joined
Jun 26, 2021
Threads
4
Messages
605
Reaction score
1,039
Location
Missouri
Vehicle(s)
2014 Focus
Engine
2.5L Hybrid
Same. I was 12/13 via Ford email, then 12/20 via my salesperson, then 1/3 via Ford email I received on 12/26 (at least my salesperson informed me of this change on 12/15 when I asked for an update so I was prepped for it).

We should be in the clear now with in production and window sticker, right?
I sure hope so, between this and my res/order that is over a year old, my patience with Ford is wearing thin, that coming from somebody who is usually very patient.
 

Sponsored

garnermike

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Aug 17, 2021
Threads
14
Messages
243
Reaction score
265
Location
north carolina
Vehicle(s)
An Outback, an Ioniq, a Corvette, a Fiat Spider
Engine
2.5L Hybrid
Yes, Jan 3 is my build week. Was originally Dec 20. I am 888/1555 on my sticker (if that means anything). Lariat hybrid, Hot Pepper Red.
I am holding my breath but not holding my breath.
 

DryHeat

2.5L Hybrid
Well-known member
First Name
DryHeat
Joined
Aug 18, 2021
Threads
8
Messages
1,556
Reaction score
3,379
Location
Arizona
Vehicle(s)
Jeep Patriot
Engine
2.5L Hybrid
Just to chime in... My experience is similar. My window sticker was "Sent to Plant" on 12/23/21, and I'm "Scheduled to Week" 1/3/21 and "Scheduled to Day" 1/8/21 (according the vehicle Full History screen on my dealer's computer).

Ford Maverick January 3rd build week? 1641159125234
The window sticker shows "116/567" at the top which -- if the OP is correct -- means I am 116th out of 567 to be built that day.


I'm wondering if anyone else is scheduled to 1/8 and if their "aaa/bbbb" numbers correspond to mine. That might help confirm that those numbers really are date specific.
 
Last edited:

99Mustang

Well-known member
First Name
Mike
Joined
Jan 8, 2021
Threads
0
Messages
127
Reaction score
195
Location
Ohio
Vehicle(s)
99 Mustang 07 F150 17 Fiesta
Just to chime in... My experience is similar. My window sticker was "Sent to Plant" on 12/23/21, and I'm "Scheduled to Week" 1/3/21 and "Scheduled to Day" 1/8/21 (according the vehicle Full History screen on my dealer's computer).

1641159125234.png
The window sticker shows "116/567" at the top which -- if the OP is correct -- means I am 116th out of 567 to be built that day.


I'm wondering if anyone else is scheduled to 1/8 and if their "aaa/bbbb" numbers correspond to mine. That might help confirm that those numbers really are date specific.
My XLT Hybrid in HPR is scheduled to be built tomorrow, 1/3, Order date was 6/21.
 

Younglefthander

2.5L Hybrid
Well-known member
First Name
Jack
Joined
Jun 23, 2021
Threads
7
Messages
170
Reaction score
294
Location
Orlando
Vehicle(s)
22 Maverick Lariat, 22 Bronco Sport Big Ben
Engine
2.5L Hybrid
Was originally scheduled for 12/13 and got pushed to week of 1/03. Dealer sent me a screenshot showing a schedule to day of 1/14/22. No sticker yet but happy that this is getting closer by the day.
Ford Maverick January 3rd build week? 2021-12-31 16.55.57
 
OP
OP

2022EOW

2.5L Hybrid
Well-known member
First Name
Marty
Joined
Jun 26, 2021
Threads
4
Messages
605
Reaction score
1,039
Location
Missouri
Vehicle(s)
2014 Focus
Engine
2.5L Hybrid
🙋🏻‍♂️I’m 952/1169 if that’s what that number actually indicates.

Did you receive anything besides an email saying you’re scheduled for week of 1/3? My tracker has shown in production since either Dec 23rd/24th.
From what I have read, that is how many total vehicles go down the line that day, both Mavericks and Bronco Sports.
 
Sponsored

jwiedle24

2.5L Hybrid
Well-known member
Joined
Jun 16, 2021
Threads
5
Messages
342
Reaction score
527
Location
Ohio
Vehicle(s)
Lariat w/Luxury Pkg
Engine
2.5L Hybrid
Just to chime in... My experience is similar. My window sticker was "Sent to Plant" on 12/23/21, and I'm "Scheduled to Week" 1/3/21 and "Scheduled to Day" 1/8/21 (according the vehicle Full History screen on my dealer's computer).

1641159125234.png
The window sticker shows "116/567" at the top which -- if the OP is correct -- means I am 116th out of 567 to be built that day.


I'm wondering if anyone else is scheduled to 1/8 and if their "aaa/bbbb" numbers correspond to mine. That might help confirm that those numbers really are date specific.
So we have 1535, 1555, 1169 and 567. Only one other day in the week missing for our puzzle! (Unless they crank out 7 days a week?)

Would be nice to see one person with the same “bbbb” number to kind of confirm like you said.
 

DryHeat

2.5L Hybrid
Well-known member
First Name
DryHeat
Joined
Aug 18, 2021
Threads
8
Messages
1,556
Reaction score
3,379
Location
Arizona
Vehicle(s)
Jeep Patriot
Engine
2.5L Hybrid
Only one other day in the week missing for our puzzle! (Unless they crank out 7 days a week?)
My "Scheduled to Day" is Saturday, 1/8/22.

Maybe Monday 1/3 is a holiday, or maybe they work 6 days a week.
 

Deep

2.5L Hybrid
Member
First Name
Pierre
Joined
Dec 27, 2021
Threads
0
Messages
20
Reaction score
15
Location
quebec canada
Vehicle(s)
Maverick XLT
Engine
2.5L Hybrid
Just to chime in... My experience is similar. My window sticker was "Sent to Plant" on 12/23/21, and I'm "Scheduled to Week" 1/3/21 and "Scheduled to Day" 1/8/21 (according the vehicle Full History screen on my dealer's computer).

1641159125234.png
The window sticker shows "116/567" at the top which -- if the OP is correct -- means I am 116th out of 567 to be built that day.


I'm wondering if anyone else is scheduled to 1/8 and if their "aaa/bbbb" numbers correspond to mine. That might help confirm that those numbers really are date specific.
Hello My Mav XLT HYBRID is 003454 175/567
Ford Maverick January 3rd build week? PhotoScan
Ford Maverick January 3rd build week? PhotoScan
 

jwiedle24

2.5L Hybrid
Well-known member
Joined
Jun 16, 2021
Threads
5
Messages
342
Reaction score
527
Location
Ohio
Vehicle(s)
Lariat w/Luxury Pkg
Engine
2.5L Hybrid
Hello My Mav XLT HYBRID is 003454 175/567
PhotoScan.jpg
PhotoScan.jpg
Awesome, so now we got two 567’s and that is for Saturday. Curious if anyone will have my matching 1,169 so I know my day without having to contact the dealer 😂
 

Deep

2.5L Hybrid
Member
First Name
Pierre
Joined
Dec 27, 2021
Threads
0
Messages
20
Reaction score
15
Location
quebec canada
Vehicle(s)
Maverick XLT
Engine
2.5L Hybrid
Same. I was 12/13 via Ford email, then 12/20 via my salesperson, then 1/3 via Ford email I received on 12/26 (at least my salesperson informed me of this change on 12/15 when I asked for an update so I was prepped for it).

We should be in the clear now with in production and window sticker, right?
You will like this one 003398 335/1167 XL Hybrid
Ford Maverick January 3rd build week? PhotoScan 3
Sponsored

 
 




Top