Sponsored

How long from build date to delivery?

zBernie

2.5L Hybrid
Well-known member
First Name
Bernie
Joined
Sep 6, 2021
Threads
55
Messages
300
Reaction score
242
Location
Northeast
Vehicle(s)
Hyundai Sonata
Engine
2.5L Hybrid
I ordered my XLT Maverick with Lux/Copilot 360/Tri-fold tonneau/mats/rear window on September 29th 2021. I just received email from Ford that my Build date is September 19th 2022. I tried searching for related articles but could not find any. Can someone tell me approximately how long from the build date to delivery to the dealer?
Sponsored

 

icegradner

2.5L Hybrid
Well-known member
Joined
Nov 5, 2021
Threads
10
Messages
2,142
Reaction score
2,550
Location
British Columbia, Canada
Vehicle(s)
2022 Maverick Hybrid
Engine
2.5L Hybrid
Clubs
 
There is no fixed amount of time, depends on availability of parts for your build. It could be a week, it could be a month just to get built. Then it could be another 1-4+ weeks for delivery.
 

JBnorthTX

2.5L Hybrid
Well-known member
First Name
Jay
Joined
Aug 21, 2021
Threads
29
Messages
884
Reaction score
1,359
Location
DFW
Vehicle(s)
2019 Mustang, 2013 Honda CRV
Engine
2.5L Hybrid
Clubs
 
There has been little consistency. Some have been delayed at the factory before shipping. Some have been stuck in railyards. Distance from the factory makes a difference, too.
 

2020 GT500

2.0L EcoBoost
Well-known member
Joined
Mar 19, 2022
Threads
24
Messages
259
Reaction score
223
Location
California
Vehicle(s)
2022 Maverick XL, 2023 Miata RF Club
Engine
2.0L EcoBoost
I ordered my XLT Maverick with Lux/Copilot 360/Tri-fold tonneau/mats/rear window on September 29th 2021. I just received email from Ford that my Build date is September 19th 2022. I tried searching for related articles but could not find any. Can someone tell me approximately how long from the build date to delivery to the dealer?
The trucks are built down in Mexico. Most likely come to the United States by train. My truck was built in mid June and I was just notified that it is finally going to arrive here in California in the next few days so for me my experience is roughly 3 months from build time to the delivery time.
 

old willie

2.5L Hybrid
Well-known member
First Name
bill
Joined
Oct 26, 2021
Threads
1
Messages
58
Reaction score
36
Location
89084
Vehicle(s)
maverick hybred
Engine
2.5L Hybrid
I live in Las Vegas, and I ordered a XLT with 360 on 9/30/21.

I received my window sticker in June and my build date kept changing until I finally got one at the end of August. The web site then said it was built on 8/31.
On 9/5 it said shipped.
I checked with my dealer 2 days ago, and they said it should be there about 9/17.
I received a call this afternoon (9/9) that it was ready to be picked up.

Tomorrow I will....
 

carbonmav05

2.5L Hybrid
Well-known member
First Name
J
Joined
Sep 30, 2021
Threads
41
Messages
218
Reaction score
251
Location
Iowa
Vehicle(s)
2016 Ford Mustang Eco
Engine
2.5L Hybrid
Depends. Anywhere from 3 weeks to months. Mine was built 8/25 and has been sitting in Mexico at the shipping yard since 8/27. Hasn’t shipped yet.
Sponsored

 
 




Top