Sponsored

how long did you wait for a Maverick Hybrid

Snipersvt

2.5L Hybrid
Member
Joined
Oct 11, 2023
Threads
3
Messages
16
Reaction score
18
Location
Springfield mo
Vehicle(s)
Mercedes c300
Engine
2.5L Hybrid
Ordered July 17th 2023
Picked up June 8th 2024
2024 lariat hybrid with BAP
Sponsored

 

Waterick

2.5L Hybrid
Well-known member
First Name
Richard
Joined
Oct 27, 2022
Threads
8
Messages
2,111
Reaction score
2,610
Location
Laurens county SC
Vehicle(s)
'24 Mav Lariat, '14 Prius, '83 'Stang, more...
Engine
2.5L Hybrid
Clubs
 
424 days
 

BILLNOROVILLE

2.5L Hybrid
Well-known member
First Name
Bill
Joined
Sep 8, 2021
Threads
18
Messages
524
Reaction score
1,050
Location
NorCal
Vehicle(s)
prius, Hybrid XLT, Honda 1100Rebel, 2) Hawk 650NT
Engine
2.5L Hybrid
Got my 22 XLT hybrid on 12/15/21, my birthday. Took 97 days for order date.
 

GotKT

2.5L Hybrid
Well-known member
Joined
Sep 14, 2023
Threads
0
Messages
84
Reaction score
112
Location
SoCal
Vehicle(s)
2023 Maverick
Engine
2.5L Hybrid
363 days from order date
 

Sponsored

mspmms

2.5L Hybrid
Well-known member
First Name
'MERICA 😎 A gulf is named after it.
Joined
Nov 9, 2021
Threads
5
Messages
7,437
Reaction score
17,439
Location
U.S.A. Indianapolis, Indiana (Downtown Indy)
Vehicle(s)
2022 XL Ford Maverick 🇺🇸
Engine
2.5L Hybrid
Clubs
 
373 days
See my sig and scroll ⬇
 
Last edited:

Deleted member 5597

Guest
I ordered a 2022 hybrid Maverick XLT on 10/15/21. I was told by the Ford dealer that it should be 8-12 weeks before it's produced and delivered. I have them 90 days, and then I called Ford Customer Service. I was told there were constraints on parts. That's all I needed to hear. I decided to call Ford dealers as far away as I was willing to travel to try to find a Maverick of any trim level. It took several weeks, but I found a hybrid XL in Gastonia, NC, and flew up there to buy it. On 30 March, the dealer I ordered from called and said they had a hybrid XLT that a customer declined to take delivery on. I traded in the XL for the XLT. I received a production date from Ford in August, followed by six emails stating delays because of parts constraints, followed by cancellation email with a Special offer to transition to a '23 hybrid with priority and a special incentive. The XLT that I had didn't have all of the options I wanted and needed, so I decided to start another search for a Maverick with options I needed, such as CP360, Lux pkg, and such. I needed CP360 due to having multiple surgeries on my cervical spine with a limited Range of Motion to the left, right, up, and down. I found a hybrid Lariat fully loaded with all the bells and whistles in Tampa on 27 Oct 22, and I negotiated the deal over the phone I drove down and traded in the XLT. I'm done looking around as I'm completely satisfied with my hybrd Lariat! Iove my little truck!
 

Montauk

2.5L Hybrid
Well-known member
First Name
Brit
Joined
Jul 21, 2023
Threads
8
Messages
216
Reaction score
318
Location
11954, 38829
Vehicle(s)
2024 Maverick XL, 2023 F-150 Rattler pkg
Engine
2.5L Hybrid
498 days. Those days are over however. The payoff for those ‘22 carryover order holders that were ok to wait, was a great deal at the end.
 
Sponsored

sanpablo

2.5L Hybrid
Well-known member
First Name
Rich
Joined
Oct 11, 2021
Threads
10
Messages
613
Reaction score
734
Location
Long Island, NY
Vehicle(s)
1967 Shelby GT500, 2016 Honda HRV, 2015 Honda CRV
Engine
2.5L Hybrid
17 months. XLT hybrid. Ordered 10/13/21. Received VIN 9/22, cancelled, rolled over to 2023. Built 2/14/23, picked up at dealer 3/6/23.
Worth the wait!
 
Last edited:

mshapeer

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Jul 18, 2023
Threads
1
Messages
135
Reaction score
197
Location
Bloomsburg, PA
Vehicle(s)
2024 Ford Maverick
Engine
2.5L Hybrid
Clubs
 
XL hybrid - 360 copilot, hitch receiver, bed mat. Ordered July 17, 2023; received February 24, 2024

Actually expected it would take longer - like May or June 2024.
 

BMCD

2.5L Hybrid
Member
First Name
Brian
Joined
Dec 1, 2023
Threads
1
Messages
8
Reaction score
5
Location
Massachusetts
Vehicle(s)
2005 Toyota Tundra SR5
Engine
2.5L Hybrid
3.5 months from Order to pick up. Lariat wt sun roof.
Sponsored

 
 







Top