Sponsored

Deciphering “in production” status

Mav

Well-known member
First Name
E
Joined
Aug 5, 2021
Threads
38
Messages
315
Reaction score
634
Location
Earth
Vehicle(s)
Lariat Maverick
My dealer showed that I would be built 9/24.
But the order tracker still shows confirmed, even though the wording says it’s in production. The first pic is from Thursday of last week. It showed in production but no date.
2nd pic is from checking this morning. And it has fridays date of 9/24, but the tracker still shows confirmed. Is the tracker just not working? Or should I be looking for a built confirmation email next week?
Ford Maverick Deciphering “in production” status 8A77AFC0-8CFE-4921-8D59-4B2A4FEAC5FF
Ford Maverick Deciphering “in production” status 19AF2B01-F92D-443C-966B-3F37E1CCC716
Sponsored

 
OP
OP
Mav

Mav

Well-known member
First Name
E
Joined
Aug 5, 2021
Threads
38
Messages
315
Reaction score
634
Location
Earth
Vehicle(s)
Lariat Maverick
Lol now the 9/24 date is gone :ROFLMAO:

Ford Maverick Deciphering “in production” status 58BAE9B3-D8E0-4A3D-96A1-8CB16992DEF3
 

STARCOMMTREY1

2.5L Hybrid
Well-known member
First Name
Trey
Joined
Aug 6, 2021
Threads
77
Messages
2,421
Reaction score
6,539
Location
Boligee, AL
Vehicle(s)
F350, Ultra Classic, Versa Note and soon to be Mav
Engine
2.5L Hybrid
Lol now the 9/24 date is gone :ROFLMAO:

58BAE9B3-D8E0-4A3D-96A1-8CB16992DEF3.png
Mine when in production then back to order confirmed and now back to in production. But at least now I have my window sticker
 
  • Like
Reactions: Mav

ATL_Mav

2.0L EcoBoost
Well-known member
First Name
Logan
Joined
Aug 28, 2021
Threads
0
Messages
104
Reaction score
140
Location
Atlanta
Vehicle(s)
Kawasaki zx6r, bmw 328is
Engine
2.0L EcoBoost
I think it's the tracker, I have been "in production" since last week, finally got a date next to it and have been stuck there. Got a window sticker on 9-14

Ford Maverick Deciphering “in production” status Screenshot_20210925-103704_DuckDuckGo
 
  • Like
Reactions: Mav
OP
OP
Mav

Mav

Well-known member
First Name
E
Joined
Aug 5, 2021
Threads
38
Messages
315
Reaction score
634
Location
Earth
Vehicle(s)
Lariat Maverick
I think it's the tracker, I have been "in production" since last week, finally got a date next to it and have been stuck there. Got a window sticker on 9-14

Screenshot_20210925-103704_DuckDuckGo.png
Glad it’s not just me. Ford really sucks at this.
 

Sponsored

ugot2know

2.0L EcoBoost
Member
First Name
Steve
Joined
Aug 28, 2021
Threads
1
Messages
24
Reaction score
41
Location
CA
Vehicle(s)
Yukon
Engine
2.0L EcoBoost
My Maverick was in production last week. At 12:30 am last night received email is was built The tracker still shows in production.
What surprised was the the delivery time to Ranch Santa Margarite Ford was Oct-5 to 11
 

clavicus

2.5L Hybrid
Well-known member
Joined
Jun 21, 2021
Threads
36
Messages
1,468
Reaction score
1,995
Location
North Carolina
Vehicle(s)
2022 Maverick Lariat Lux Hybrid
Engine
2.5L Hybrid
Some people never even got an In Production status and instead just were notified when it was built, surprising them. If Ford didn’t tell you your production date was delayed to another week then you can probably just sit tight and hope for that built status next week? The tracker system seems wonky overall.
 

slashy42

Well-known member
Joined
Jun 16, 2021
Threads
9
Messages
352
Reaction score
758
Location
Texas
Vehicle(s)
2022 Ford Maverick
The circle around the dot means your in that step. The date is the day it finishes production, but may still be getting qa checks. A checkmark in the circle means it's completed that step.
 

Eagle11

2.5L Hybrid
Well-known member
Joined
Aug 6, 2021
Threads
17
Messages
1,948
Reaction score
1,646
Location
Valley of the Sun
Vehicle(s)
'07 Boxster S, 2018 BMW M5, Ducati's, Suzuki's
Engine
2.5L Hybrid
Clubs
 
In production means it's being scheduled to be built. Once the app goes to 'Built" your Maverick has rolled off the assembly line, went through final inspection, and waiting to be transported.

The factory will place orders in sequence according to model, color, and options. For example, On Monday they might start with Hybrid, XL, Cyber Orange plus other options. The next run could be Hybrid, Cyber Orange, XLT, plus options, then Lariat Hybrid, Cyber orange plus options.

When I was in Detroit I took the F150 tour and this is how it was explained to me on the tour. If anyone gets the Detriot take the F150 tour is they still have it, pretty amazing watching them build trucks.
 
OP
OP
Mav

Mav

Well-known member
First Name
E
Joined
Aug 5, 2021
Threads
38
Messages
315
Reaction score
634
Location
Earth
Vehicle(s)
Lariat Maverick
The circle around the dot means your in that step. The date is the day it finishes production, but may still be getting qa checks. A checkmark in the circle means it's completed that step.
Makes sense. Thanks for the clarification
Sponsored

 
 




Top