Sponsored

Are MY23 orders done? And MY24 only being built?

joestantoine

2.5L Hybrid
Member
Joined
Dec 3, 2022
Threads
9
Messages
18
Reaction score
19
Location
WI
Vehicle(s)
2023 Maverick
Engine
2.5L Hybrid
I see a lot of MY 24 builds being scheduled and was wondering if they are done building MY 23s for good?
Sponsored

 

Wixron

2.5L Hybrid
Active member
First Name
Ron
Joined
Sep 24, 2022
Threads
0
Messages
43
Reaction score
47
Location
MI
Vehicle(s)
2021 escape
Engine
2.5L Hybrid
I see a lot of MY 24 builds being scheduled and was wondering if they are done building MY 23s for good?
I hope not.. mine is scheduled for the week of 9-11
 

garryjohnson

2.0L EcoBoost
Well-known member
First Name
Garry
Joined
Jan 2, 2022
Threads
16
Messages
293
Reaction score
347
Location
Pensacola, FL
Vehicle(s)
Ford Maverick XLT FX4 Atlas Blue
Engine
2.0L EcoBoost
Clubs
 
I believe scheduling is done, but '23s will be built into the first part of October. Then they will be done.
 

fordvideoguy

Well-known member
First Name
Tim
Joined
Jul 10, 2021
Threads
123
Messages
1,827
Reaction score
6,799
Location
Salina, KS
Website
www.long-mcarthur.com
Vehicle(s)
2022 F-150 Lightning, 2021 Ford Bronco
Engine
Undecided
I see a lot of MY 24 builds being scheduled and was wondering if they are done building MY 23s for good?
The change over is 10/16. That is the first day they are building 2024s
 

everdrive

2.0L EcoBoost
Member
Joined
Aug 19, 2023
Threads
1
Messages
17
Reaction score
22
Location
USA
Vehicle(s)
1998 F150
Engine
2.0L EcoBoost
I see a lot of MY 24 builds being scheduled and was wondering if they are done building MY 23s for good?
I doubt it. I checked with dealer, and she gave me a very polite version of "They're still working on 2023 orders, yours won't be for a while." While this isn't definitive, I would bet that they're not finished working through the old 2023 orders.
 

Sponsored

PriusHater

2.5L Hybrid
Well-known member
First Name
Michael
Joined
Jun 23, 2021
Threads
25
Messages
446
Reaction score
607
Location
Florida
Website
www.rocketstem.org
Vehicle(s)
Maverick
Engine
2.5L Hybrid
My XL Hybrid is in production right now.
 

gwrace14651

2.5L Hybrid
Well-known member
First Name
David
Joined
Sep 2, 2022
Threads
37
Messages
877
Reaction score
847
Location
TX
Vehicle(s)
2024 Ford Maverick Lariat Hybrid
Engine
2.5L Hybrid
Clubs
 
The change over is 10/16. That is the first day they are building 2024s
I guess I got lucky. I received the email from Ford that my 24 Lariat Hybrid is scheduled for Oct 16. That said If I receive it by Thanksgiving it will have been a 435 day wait.
Sponsored

 
 




Top