- Thread starter
- #1
Just received my truck and how crazy I must be to wait 26 months to get a new Lariat hybrid built for me. If I never hear the words “dealer allocation and constraints” it will be too soon. I have several four letter words to describe the scheduling system that Ford uses on the Maverick. My dealer did not drop the ball on any of the 3 orders and dotted all I’s and crossed the t’s correctly. I believe in supporting your local hometown business and how are small hometown dealers ever going to grow if they don’t get allocations for popular models? It looks like that thousands of hybrids have been built that were ordered many, many months after my order. Some get built in 6 months and I waited 26 months. What’s wrong with this picture?
I am trading in a 2020 Fusion hybrid with 50K miles and have not had ONE service repair needed. Keeping my fingers crossed that my new hybrid is as good as the old one. My rant is over.
I am trading in a 2020 Fusion hybrid with 50K miles and have not had ONE service repair needed. Keeping my fingers crossed that my new hybrid is as good as the old one. My rant is over.
Sponsored