- First Name
- Dan
- Joined
- Feb 9, 2023
- Threads
- 8
- Messages
- 119
- Reaction score
- 186
- Location
- SouthEast Wisconsin
- Vehicle(s)
- 2024 Mav Lariat Hybrid, 2015 Hyundai Santa Fe
- Engine
- 2.5L Hybrid
Now, back to the original reason for this post.
I "Chatted" with Ford today (8/22/'23). My rollover from MY23 to MY24 is in, status is "Processing", Priority 2. My dealer put it in as as a priority 10.
Now we wait to be scheduled.
With 22,000 '23 hybrid rollovers to be built, If Ford builds 7000Mavericks per month and half are hybrids (optimistic), my guess is they will catch up in 6-7 months. At worst case, maybe built before May, 2024.
After 1 year waiting, I can wait a little longer.
I "Chatted" with Ford today (8/22/'23). My rollover from MY23 to MY24 is in, status is "Processing", Priority 2. My dealer put it in as as a priority 10.
Now we wait to be scheduled.
With 22,000 '23 hybrid rollovers to be built, If Ford builds 7000Mavericks per month and half are hybrids (optimistic), my guess is they will catch up in 6-7 months. At worst case, maybe built before May, 2024.
After 1 year waiting, I can wait a little longer.
Sponsored