Sponsored

Thoron99

2.5L Hybrid
Well-known member
First Name
John
Joined
Oct 29, 2021
Threads
10
Messages
352
Reaction score
683
Location
NC
Vehicle(s)
2023 Maverick Hybrid XL
Engine
2.5L Hybrid
Looks like lots of hybrids and hitches were scheduled this week, maybe they’re not constrained anymore?
Sponsored

 

Pete0055

2.5L Hybrid
Active member
First Name
Ryan
Joined
Sep 20, 2022
Threads
1
Messages
39
Reaction score
51
Location
Minneapolis
Vehicle(s)
Toyota Avalon, Future Maverick XLT Hybrid Owner
Engine
2.5L Hybrid
Clubs
 
After 489 days of waiting....I finally got the email and my VIN #. Production scheduled for the week of April 17th. Beyond excited!

Cactus Grey XLT Lux Hybrid w/ BAP.

Ford Maverick 📬 2/9/23 Scheduling Email Received Group [EMAILS NOW ARRIVING] kip
 

Pete0055

2.5L Hybrid
Active member
First Name
Ryan
Joined
Sep 20, 2022
Threads
1
Messages
39
Reaction score
51
Location
Minneapolis
Vehicle(s)
Toyota Avalon, Future Maverick XLT Hybrid Owner
Engine
2.5L Hybrid
Clubs
 

MichaelG

2.5L Hybrid
Well-known member
First Name
Michael
Joined
Jan 19, 2022
Threads
18
Messages
324
Reaction score
323
Location
SE Michigan
Vehicle(s)
2002 Ranger
Engine
2.5L Hybrid
Yes! My Maverick is in production earlier than expected!

Ford Maverick 📬 2/9/23 Scheduling Email Received Group [EMAILS NOW ARRIVING] production
 

Christenhildebrandt

2.5L Hybrid
Well-known member
First Name
Christen
Joined
Aug 8, 2021
Threads
25
Messages
312
Reaction score
402
Location
South Dakota
Vehicle(s)
Ford Fusion
Engine
2.5L Hybrid
Looks like lots of hybrids and hitches were scheduled this week, maybe they’re not constrained anymore?
I would gladly be hitch only instead of Lux Hybrid but I was told the odds were better this way if you want the hitch. Waiting is the hardest part.
 

Sponsored

GoZags

2.5L Hybrid
New member
Joined
Feb 9, 2023
Threads
0
Messages
2
Reaction score
10
Location
Seattle
Vehicle(s)
Dodge Grand Caravan
Engine
2.5L Hybrid
Having gotten used to not being scheduled (and not being too anxious about it), I didn't check my email until last night. Son of a gun, I had an email from Ford that was received yesterday morning (2/9) at 8:15 AM PT stating that my XL hybrid (iconic silver) is scheduled for production the week of April 10. VIN ending in 375XX. Co-pilot 360 was the only option I ordered. So pretty basic.

I'm in Western WA. Placed my order through AutoNation Ford Bellevue (WA) on 9/17/22 after a call from salesperson on the evening of 9/15 stating the order bank was open. The in-person order process took less than an hour. Salesperson said I would likely not see a truck for 6 to 8 months. When I got home I had a Ford email confirming my order. I would check occasionally with the dealer's GM and got on a first name basis. He kept me apprised as to how many orders he had, where I was in line (about middle of pack), and what his allocation looked like. He always cautioned that there were no guarantees and that Ford Maverick scheduling was unpredictable, but he kept saying that with his allocation and my position in his priority rankings it was most likely a question of "when, not if" my order would go to production. Having nothing but good things to say about how the dealership handled everything. Was not a customer previously and had no special relationship. Dealership was very upfront, very efficient, and, as it turned out, very accurate (at the dealership level).
 

Dr3wman

Well-known member
First Name
Andrew
Joined
Jul 10, 2022
Threads
3
Messages
125
Reaction score
216
Location
Tacoma
Vehicle(s)
2020 Ram
Engine
Undecided
Looks like lots of hybrids and hitches were scheduled this week, maybe they’re not constrained anymore?
From everything I have read here - while it may seem like more are being scheduled - the number of Hybrids built by Ford will still be limited to the 35% capacity that they outlined at the beginning of the 23 model year. 🤷‍♂️
 

Michiganmustangs

2.5L Hybrid
Active member
First Name
Carl
Joined
Jan 18, 2021
Threads
0
Messages
35
Reaction score
32
Location
Michigan
Vehicle(s)
2018 Ford Escape, 2007 Ford Mustang GT
Engine
2.5L Hybrid
  • ⏰ February 9, 2023 @ 11:11am EST (interesting as my original order was on 11/11/21
  • 📅 April 17, 2023
  • 🔢 364XX
  • (If you have it) the serial number part of your VIN.. XX out the last 2 digits if you like
  • 🛻 White Exterior, XL, Hybrid with only option, trailer hitch, (dropped floor mats, mud flaps, and Spray in bed liner as they were at one point, constraints during this journey
  • 📍 Metro Detroit
  • 🗓 November 11, 2021, Never scheduled/No VIN, 2022 rollover, converted order fro 2022 to 2023 on September 15, 2022
  • 🕺 Dean Sellers Ford (Troy, MI). Purchased many vehicles from them, honoring all original pricing, etc.
 

mikegs1952

2.0L EcoBoost
Well-known member
First Name
mike
Joined
Sep 17, 2022
Threads
5
Messages
53
Reaction score
61
Location
idaho
Vehicle(s)
F150
Engine
2.0L EcoBoost
Received notice 2/09/2023 9:14 MS
Ordered 9/165/2022
EST build date 04/10/2023
CG Lariat
Boise Id
Kendall Ford
Anyone have average built to delivery Time?? 30-90 days?
 

spexmaverick

2.5L Hybrid
Well-known member
First Name
Roy
Joined
Jan 26, 2022
Threads
21
Messages
209
Reaction score
399
Location
California, USA
Vehicle(s)
2023 Hybrid XLT Maverick
Engine
2.5L Hybrid
Got my email yesterday at 8:11 AM Pacific that my Mav is scheduled for the week of April 10.

Original order date November 8, 2021 order, carried over to September 16, 2022.

XLT Hybrid, Carbonized Gray, Lux Pkg, CP360, SIBL, Cleat System, Rear Slider.

Citrus Ford Ontario; this is my second Maverick order. I have a '22 XL AWD,Velocity Blue that i received from Citrus Ford in January 2022.

Now the second part of waiting begins.

Ford Maverick 📬 2/9/23 Scheduling Email Received Group [EMAILS NOW ARRIVING] IMG-1962
 
Last edited:
Sponsored

WNYEscapee

2.0L EcoBoost
Well-known member
First Name
TJ
Joined
Jul 6, 2022
Threads
1
Messages
658
Reaction score
1,025
Location
BFLO
Vehicle(s)
2023 Maverick, 2019 Cherokee
Engine
2.0L EcoBoost
Clubs
 
I received my build date confirmation sometime during the night, found it this morning at 5:30.

Scheduled build week is 4/10
Last 8 of VIN: PRA36429
Build date is: 2.0L AWD XLT, Oxford White, Luxury Package.
My dealer is in the Pittsburgh Region
My original order date for MY 2023 was: the first day the order bank opened.
My Dealer is : Dave Smith Ford in Williamsville, NY
 

MaverickFan2023

2.5L Hybrid
Active member
First Name
Shawn
Joined
Sep 17, 2022
Threads
5
Messages
26
Reaction score
21
Location
League City Texas
Vehicle(s)
2023 Maverick
Engine
2.5L Hybrid
No email again. It really hurts to see posts of people who put in a new order (with the same build with exception of color) get VINs.

1676026139339.png
days and counting...
Holy Fuck. Something doesn’t seem right. My son ordered his in August of 2021 and received it May 20th 2022. Are you sure that your dealership actually sent in the order?
 

TylerDurden

2.5L Hybrid
Well-known member
Joined
Mar 27, 2021
Threads
1
Messages
91
Reaction score
136
Location
Chicago, IL
Vehicle(s)
2003 Mercury Marauder & 2002 Ford Explorer
Engine
2.5L Hybrid
Depends on whether Ford burned through their planned allotment of XLs with their roughly 9,000 fleet builds.
They didn't, because my hybrid XL was just scheduled, projected for the week of March 27th!
 

Euby

2.5L Hybrid
Well-known member
Joined
Oct 23, 2021
Threads
17
Messages
184
Reaction score
294
Location
White Bluff, TN
Vehicle(s)
'23 Maverick XLT Hybrid
Engine
2.5L Hybrid
Clubs
 
Holy Fuck. Something doesn’t seem right. My son ordered his in August of 2021 and received it May 20th 2022. Are you sure that your dealership actually sent in the order?
I've been getting the 45-day "disappointment" emails, so Ford definitely knows about it. Checked with Ford Chat several times. Same story every time... Priority 10 - Unscheduled Clean.
 

BG43017

2.5L Hybrid
Well-known member
First Name
Bob
Joined
Oct 16, 2021
Threads
0
Messages
51
Reaction score
91
Location
Dublin, Ohio
Vehicle(s)
Escape, Tucson
Engine
2.5L Hybrid
🖕🏿Ford Motor Company.

Another week gone and nothing to report! It has now been 483 days since I initially ordered my 2022MY Maverick. I reordered a 2023MY on Sept 16 at 9 AM. All paperwork completed properly. It is a priority 10 order. My dealership has plenty of 2023 allocations.
Sponsored

 
 







Top