Sponsored

How many times did your production date change?

Macro

Active member
Joined
Jun 27, 2021
Threads
3
Messages
31
Reaction score
23
Location
Michigan
Vehicle(s)
Maverick
I'm on 3 (started at 1/31, moved to 1/24, then back to 2/7). I saw somewhere (here? facebook? reddit?) someone describing a ridiculous number of changes, and even some weird stuff like having their date moved to a date in the past, and then their truck moving to in production immediately.

What's your experience?
Sponsored

 

bbhaag

Well-known member
Joined
Jul 21, 2021
Threads
15
Messages
1,796
Reaction score
3,298
Location
Illinois
Vehicle(s)
Maverick XLT, Mustang Mach-E GT Performance
Engine
Undecided
Just once. It got moved from 12/13/2021 to 12/20/2021.
 

Edge Haley

2.5L Hybrid
Well-known member
First Name
Edge
Joined
Jul 17, 2021
Threads
5
Messages
1,351
Reaction score
1,825
Location
CARBONDALE-Atlanta
Vehicle(s)
PORSCHE
Engine
2.5L Hybrid
3, but when I went to "Scheduled" for Build, it sat there for 45 days before going to Build, 30 days in build before Shipping.
 
OP
OP

Macro

Active member
Joined
Jun 27, 2021
Threads
3
Messages
31
Reaction score
23
Location
Michigan
Vehicle(s)
Maverick
3, but when I went to "Scheduled" for Build, it sat there for 45 days before going to Build, 30 days in build before Shipping.
You mean it was 45 days after your scheduled build week before it actually said "Built"?
 

Edge Haley

2.5L Hybrid
Well-known member
First Name
Edge
Joined
Jul 17, 2021
Threads
5
Messages
1,351
Reaction score
1,825
Location
CARBONDALE-Atlanta
Vehicle(s)
PORSCHE
Engine
2.5L Hybrid
You mean it was 45 days after your scheduled build week before it actually said "Built"?
Yes, my delivery email noted there was a delay due to "chip" needed.
 

Sponsored

New2AZ

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Aug 9, 2021
Threads
10
Messages
814
Reaction score
1,506
Location
Scottsdale, AZ
Vehicle(s)
2019 Civic EX Hatchback
Engine
2.5L Hybrid
Once (so far). 1/31 to 2/7
 

Falcon first

2.5L Hybrid
Well-known member
First Name
Scott
Joined
Jul 31, 2021
Threads
4
Messages
242
Reaction score
405
Location
Columbia, SC
Vehicle(s)
BMW X3, BMW M235 coupe
Engine
2.5L Hybrid
This post is bad luck, mine just moved from Jan 24 to Feb 7.
 

Naranjita

2.5L Hybrid
Well-known member
First Name
NAH-RON-EE-TAH
Joined
Jul 7, 2021
Threads
13
Messages
1,715
Reaction score
3,468
Location
Steamboat Island, Washington
Vehicle(s)
2025 Maverick Lariat Hybrid AWD BAP
Engine
2.5L Hybrid
Once.
 

MTMaverick

2.5L Hybrid
Well-known member
Joined
Jul 23, 2021
Threads
0
Messages
61
Reaction score
120
Location
MT
Vehicle(s)
99 Chevy 1T
Engine
2.5L Hybrid
Production date? What's a production date? :p
 
Sponsored

BARTMAVERICK

2.0L EcoBoost
Well-known member
Joined
Jun 27, 2021
Threads
3
Messages
193
Reaction score
278
Location
Hershey PA
Vehicle(s)
2022 Maverick Lariat
Engine
2.0L EcoBoost
Originally scheduled for 12/6 then moved to 12/13 and then to 12/20. Actual build on 12/23.
 

westyman71

2.0L EcoBoost
Well-known member
First Name
C
Joined
Dec 27, 2021
Threads
7
Messages
114
Reaction score
205
Location
Kentucky
Vehicle(s)
2022 XL Ecoboost
Engine
2.0L EcoBoost
Twice. Original was 9/29, then 10/13, then 10/27
Stayed as in production from 10/27 to 12/13 (hybrid)
Got built email 12/13
Shipped 12/15
Arrived at dealer in Kentucky 12/30
 
Last edited:

Cookie42693

2.5L Hybrid
Active member
Joined
Sep 3, 2021
Threads
0
Messages
34
Reaction score
25
Location
DC
Vehicle(s)
2022 maverick xlt
Engine
2.5L Hybrid

CareBear

Member
First Name
Carrie
Joined
Mar 16, 2022
Threads
0
Messages
10
Reaction score
20
Location
Florida
Vehicle(s)
2022 Maverick
I'm on 3 (started at 1/31, moved to 1/24, then back to 2/7). I saw somewhere (here? facebook? reddit?) someone describing a ridiculous number of changes, and even some weird stuff like having their date moved to a date in the past, and then their truck moving to in production immediately.

What's your experience?
 

CareBear

Member
First Name
Carrie
Joined
Mar 16, 2022
Threads
0
Messages
10
Reaction score
20
Location
Florida
Vehicle(s)
2022 Maverick
2/2 to 5/3 to 3/30 to 5/1 delivered on 3/17.
Sponsored

 
 







Top