My build date was changed five or six times before it finally went into production, it is what it is. Some people are still waiting for or will never get a build date for a 2024, maybe find some solace in that.
Also it might be a blessing since apparently the turn signal recall has resulted in a Stop Sale until it is resolved (see post #118). Might be better for it not to get built until they have the fix at the factory instead of it sitting at your dealer in a back lot waiting for the fix to get done. https://www.mavericktruckclub.com/f...call-truck-is-still-on-the-train.40867/page-8
I too got the "we're sorry" email. My XLT Hybrid was scheduled to begin production 12/11, but didn't actually go to "production" until 12/20. I expect it will be delayed even more because I have 2 constraint items: hybrid power train and BAP. I try not to get excited about things I have no control over.