- First Name
- Connor
- Joined
- Oct 16, 2021
- Threads
- 98
- Messages
- 953
- Reaction score
- 2,427
- Location
- South Florida
- Vehicle(s)
- 2024 Ford Maverick Lariat FX4
- Engine
- 2.0L EcoBoost
- Thread starter
- #1
I'm just wondering what is taking so long for my truck to get finally built? It's a Lariat EB FX4 with only two options: the $800 FX4 package and $495 Hot Pepper Red color. It should be very easy to build since the EB's aren't on constraint and I have very little options. Plus, the Lariat for MY24 has the previously optioned safety and luxury package as standard equipment now for less complexity on the assembly line. It was scheduled for production on Jan. 15 with a time stamp of Jan. 19 as the production date on my order tracker. I feel like it should be built at this point. Is this considered normal or am I just being impatient? Not that I need this truck right now since I currently have my nice Maverick but the anticipation is killing me!
Sponsored