if 12/6 is the build week, expect it to be built sometime tomorrow.XLT Ecoboost 2.0L with XLT Luxury Package, Floor Mats, Soft Folding Tonneau Cover, Rear Sliding Window, Co Pilot 360 and full size spare.
Ordered 6/19
First Scheduled 11/15
Second Scheduled 11/25
Third Scheduled 12/6
In Production 11/29 with blend date and window sticker.
Window sticker date change on bottom to 12/7
Blend date still remained the same 11/29/21
Modules not live yet.
No updates since 11/29. I figured it would be built by now?
Anyone have any insight?