How do you figure? There are currently many 23s being scheduled while many 22 rollovers are not being sceduled.
Ok I have had 5 schedule production dates for my Maverick. I order on 10/27/2021. I been roll to a 23 by Ford with 22 prices. Let's see what happens to your dates
 

Sponsored

Richmond Ford

Banned
Banned
Joined
Nov 3, 2022
Threads
1
Messages
50
Reaction score
57
Location
Richmond
Vehicle(s)
Maverick Lariat
Ok I have had 5 schedule production dates for my Maverick. I order on 10/27/2021. I been roll to a 23 by Ford with 22 prices. Let's see what happens to your dates
While some orders, such as yours, have been delayed repeatedly, the vast majority of orders get one build date and that is that. Delays are the exception. Build dates being correct the first time is the norm.
 

MakinDoForNow

2.5L Hybrid
Well-known member
First Name
James
Joined
Sep 24, 2021
Threads
2
Messages
8,482
Reaction score
6,052
Location
Texas
Vehicle(s)
2022 Maverick
Engine
2.5L Hybrid
How do you figure? There are currently many 23s being scheduled while many 22 rollovers are not being scheduled.
The 23's being scheduled now are ones with vins that they need to get out of the way of all the 2022's that have been pushed to 12/19 week which will be released after 11/30 and will be scheduled ASAP before all other 2023's subject to any constraints, of course.
 

Gooberhamm

2.0L EcoBoost
Well-known member
First Name
Joe
Joined
Sep 26, 2022
Threads
1
Messages
91
Reaction score
118
Location
Minnesota
Vehicle(s)
2015 Toyota Corolla S Premium
Engine
2.0L EcoBoost
EB Lariat Lux with moon roof, here. Got my "We're sorry n' $hit" email on Monday.

Ford Maverick Scheduled for production email (received 11/3/22) !!!!!!!!!!!!!!!!!!!!!!! 1667591243403
 
Sponsored

Richmond Ford

Banned
Banned
Joined
Nov 3, 2022
Threads
1
Messages
50
Reaction score
57
Location
Richmond
Vehicle(s)
Maverick Lariat
The 23's being scheduled now are ones with vins that they need to get out of the way of all the 2022's that have been pushed to 12/19 week which will be released after 11/30 and will be scheduled ASAP before all other 2023's subject to any constraints, of course.

I am not following what you are saying. There are 23s being scheduled (and will be built) before all of the rollovers are scheduled/built.
 

kcamp317

2.0L EcoBoost
Well-known member
Joined
Dec 3, 2021
Threads
48
Messages
433
Reaction score
584
Location
Cincinnati, OH
Vehicle(s)
'20 Ford Escape Titanium Hybrid 16 Ford Escape SE
Engine
2.0L EcoBoost
Im a rollover 22. Got my email yesterday. I have CP360 and XLT Lux so I'm sure I'll be rescheduled a few times. Also scheduled week of Dec 19th for now and have a VIN. At least its something!
 

Kmbales

Member
First Name
Katherine
Joined
Nov 15, 2021
Threads
0
Messages
22
Reaction score
38
Location
St Petersburg, FL
Vehicle(s)
Maverick hybrid on order, Nissan versa hatchback
Finally got mine. I put down $27k cash since I just refinanced my house, and if that is in my account, I'd spend some of it. Got tired of not having a car after a whole year, so I got a refund check for $26k that I just deposited into my savings account. Literally about to look at a Tacoma to buy in the meantime when I got the email. Can't decide whether I should still buy a Tacoma in case it's another year before I actually get it 🙃

Ford Maverick Scheduled for production email (received 11/3/22) !!!!!!!!!!!!!!!!!!!!!!! Screenshot_20221104-162221_Gmail
 

MakinDoForNow

2.5L Hybrid
Well-known member
First Name
James
Joined
Sep 24, 2021
Threads
2
Messages
8,482
Reaction score
6,052
Location
Texas
Vehicle(s)
2022 Maverick
Engine
2.5L Hybrid
I am not following what you are saying. There are 23s being scheduled (and will be built) before all of the rollovers are scheduled/built.
I am one of the "lucky 2022's with vins" that were scheduled to be built last week of October through week of 11/28 which have been moved to the week of 12/19. Said week of 12/19 is being used to consolidate the 2022's with vins that could not be built after the 2022's that have already reordered 2023's. These late 2022 cancellations will be given a private offer and after 11/30 will also enter the 2023 order scheduling presumably with new 2023 vins and also presumably have some scheduling priority. Who knows. The 2023's currently being scheduled should be built subject to constraints of course. Apparently some 2023's are being assigned 12/19 build dates but they should be ahead of all the 2022's that are temporarily assigned that week. On the plus side Ford has said that the allocations for these late 2022 to 2023 conversions will carry their allocations forward to 2023 but not necessarily attached to the same truck.
 

The Weatherman

2.0L EcoBoost
Well-known member
First Name
Dean
Joined
Jul 20, 2021
Threads
21
Messages
2,470
Reaction score
3,542
Location
KY
Vehicle(s)
2022 Maverick Lariat Lux FX4 4K x 2
Engine
2.0L EcoBoost
The thing some of you may not be considering is the dealers allocations.

it’s not like Ford is going to line up all the rollover orders and build them one after the other. They are going to use the dealers allocations and then look for rollover orders they have that meet the availability of parts and then they will look to the next dealer.

Im not justifying the system, I’m just reminding everyone here about how it works.

Good Luck to all rollover order holders.