- First Name
- Dale
- Joined
- Sep 15, 2022
- Threads
- 7
- Messages
- 60
- Reaction score
- 64
- Location
- Girard illinois
- Vehicle(s)
- 84 cutlass, 2011 silverado,
- Engine
- 2.5L Hybrid
- Thread starter
- #1
When checking the tracker i had been seeing my schedule date 10/23. Now the tracker says 10/27 in production which was friday. Does that mean that it is actually on the assembly line as of that date. I havent received any different emails stating anything since the schedule date email
Sponsored