Mine is still "In Production" with no dates on the tracker. Window sticker was first printed on 5/13 for a build week of 5/16 and nothing since then. Sounds like it could take up to 18 days to show a "built" status.
Exactly the same for me...
Sponsored

 

Nw_adventure

2.0L EcoBoost
Well-known member
Joined
Aug 3, 2021
Threads
101
Messages
3,134
Reaction score
2,930
Location
Salt Lake city
Vehicle(s)
Honda Element/ Toyota Highlander
Engine
2.0L EcoBoost
Just checked and mine now also shows Built 5/24!
Yay - Mine officially got the built day stamp of 5/23 - Hoping that was a good week to not forget any electrical connections, bolts, etc but add three more coats of paint -)
 

Nw_adventure

2.0L EcoBoost
Well-known member
Joined
Aug 3, 2021
Threads
101
Messages
3,134
Reaction score
2,930
Location
Salt Lake city
Vehicle(s)
Honda Element/ Toyota Highlander
Engine
2.0L EcoBoost
mines been in production for 5 days now. and now the tracking webcite wont populate my order anymore
That nonsense will happen for about another ten days. My suggestion is to avoid the internet during this time to alleviate un-needed anxiety -)
 

n0maverick

2.5L Hybrid
Well-known member
Joined
Dec 27, 2021
Threads
0
Messages
326
Reaction score
471
Location
MidMO
Vehicle(s)
2022 Tiguan, 2022 Maverick, 2013 Escape
Engine
2.5L Hybrid
That nonsense will happen for about another ten days. My suggestion is to avoid the internet during this time to alleviate un-needed anxiety -)
yep then eventually you get the even longer rail and convoy tracking. trains are not very efficient I've learned
 

Nw_adventure

2.0L EcoBoost
Well-known member
Joined
Aug 3, 2021
Threads
101
Messages
3,134
Reaction score
2,930
Location
Salt Lake city
Vehicle(s)
Honda Element/ Toyota Highlander
Engine
2.0L EcoBoost
yep then eventually you get the even longer rail and convoy tracking. trains are not very efficient I've learned
Yeah my railcar left Nogalas and instead of heading towards Vegas then SLC, it's heading to LAX and I'm like huh ?
 

Sponsored

Rambo

2.5L Hybrid
Member
First Name
Roy
Joined
Aug 2, 2021
Threads
1
Messages
10
Reaction score
8
Location
Fredericksburg Tx
Vehicle(s)
2019 CRV
Engine
2.5L Hybrid
window sticker shows May. 13 with build date May 16. Have not heard a thing from Ford but the modules showed they populated this morning so I guess it is built
 

PeteSJCA

2.5L Hybrid
Well-known member
First Name
Pete
Joined
Oct 1, 2021
Threads
1
Messages
140
Reaction score
126
Location
San Jose, CA
Vehicle(s)
2025 Maverick Lariat Hybrid AWD Eruption Green
Engine
2.5L Hybrid
Clubs
 

n0maverick

2.5L Hybrid
Well-known member
Joined
Dec 27, 2021
Threads
0
Messages
326
Reaction score
471
Location
MidMO
Vehicle(s)
2022 Tiguan, 2022 Maverick, 2013 Escape
Engine
2.5L Hybrid
Yeah my railcar left Nogalas and instead of heading towards Vegas then SLC, it's heading to LAX and I'm like huh ?
my railcar made it to kc in 6 days from mexico. but has been to stl and back to kc and just waiting on the rail the last 9 days. When it does get unloaded then there is convoy delays. Dealer has some mach-e that have been sitting there over a month. oh well at least its coming. dealer told me today they will only be able to order 10 MY23 Mavericks a month starting in august. Their waitlist is already at 73. The lightening waitlist is 440 and ford is only accepting about 2 orders a month. Thats what they said anyway.
 
Sponsored

Dnahwols

2.0L EcoBoost
Active member
First Name
JR
Joined
Oct 10, 2021
Threads
5
Messages
28
Reaction score
61
Location
York, PA
Vehicle(s)
1994 Ford Fanger
Engine
2.0L EcoBoost
They found some Black paint! - Ordered 10/05/21 - WS 05/12/22 - in production 05/16/22 -Tracker says Now BUILT 05/27/22 - Awaiting shipment - Can't believe it
 

SayCheessee

Well-known member
First Name
Jason
Joined
Jan 17, 2022
Threads
0
Messages
47
Reaction score
105
Location
TX
Vehicle(s)
Honda CRV
Order update for 5/9 build week:
Emailed my dealer on 5/23, at the start of 3rd wk "in production" with no date, told me it should be built by end of week. It was built on Wednesday( 5/25) and all modules populated. Shipped Friday (5/27) with arrival at dealer 6/17-23. I never got a blend date. Ford tracker said Shipped but showing in production with 5/24.

Timeline: most ppl average 2wks to build from their Production wk. I've seen some at 1wk but mine took 3wks, I guess that's not unusual either.

If everything stay on schedule, that's a full 11 months journey for me. When I ordered in July, dealer told me it'd be around Thanksgiving to get the truck. He would probably be right if Ford didn't pulled that allocation BS stunt that they now admitted and reversed course on.

Hope the timeline help some of you so you don't keep checking constantly on a daily basis and drive yourself nuts (speaking from personal experience).
 

Wx Man

2.5L Hybrid
Well-known member
First Name
Hendricus
Joined
Aug 31, 2021
Threads
13
Messages
144
Reaction score
270
Location
Gray, Maine USA
Vehicle(s)
2022 Maverick Hybrid Lariat
Engine
2.5L Hybrid
Order update for 5/9 build week:
Emailed my dealer on 5/23, at the start of 3rd wk "in production" with no date, told me it should be built by end of week. It was built on Wednesday( 5/25) and all modules populated. Shipped Friday (5/27) with arrival at dealer 6/17-23. I never got a blend date. Ford tracker said Shipped but showing in production with 5/24.

Timeline: most ppl average 2wks to build from their Production wk. I've seen some at 1wk but mine took 3wks, I guess that's not unusual either.

If everything stay on schedule, that's a full 11 months journey for me. When I ordered in July, dealer told me it'd be around Thanksgiving to get the truck. He would probably be right if Ford didn't pulled that allocation BS stunt that they now admitted and reversed course on.

Hope the timeline help some of you so you don't keep checking constantly on a daily basis and drive yourself nuts (speaking from personal experience).
Thanks this helps...my July order went into production the week of 5/16. Have had no change in status...using your timeline that would put my build around June 1st...this week! Let's hope that holds true (y)
 

nc-maverick

2.5L Hybrid
Active member
First Name
Ed
Joined
Jun 25, 2021
Threads
0
Messages
28
Reaction score
42
Location
NC
Vehicle(s)
Maverick
Engine
2.5L Hybrid
Clubs
 
Order update for 5/9 build week:
Emailed my dealer on 5/23, at the start of 3rd wk "in production" with no date, told me it should be built by end of week. It was built on Wednesday( 5/25) and all modules populated. Shipped Friday (5/27) with arrival at dealer 6/17-23. I never got a blend date. Ford tracker said Shipped but showing in production with 5/24.

Timeline: most ppl average 2wks to build from their Production wk. I've seen some at 1wk but mine took 3wks, I guess that's not unusual either.

If everything stay on schedule, that's a full 11 months journey for me. When I ordered in July, dealer told me it'd be around Thanksgiving to get the truck. He would probably be right if Ford didn't pulled that allocation BS stunt that they now admitted and reversed course on.

Hope the timeline help some of you so you don't keep checking constantly on a daily basis and drive yourself nuts (speaking from personal experience).
Thanks I hope you are right. Mine should be built this week then. By the time I get it will be just over a year after ordering last June.
 
 