Sponsored

Just got build date pushed for third time

DogNamedMaverick

Banned
Banned
Joined
Feb 3, 2022
Threads
2
Messages
27
Reaction score
119
Location
MA
Vehicle(s)
Varies
I got an update this evening.
Originally scheduled week of March 14th
1st update email last week was a delay to April 4th.
Tonight's update was a move up a week to March 28th.

Let's see what's next.
Sponsored

 
OP
OP
Scout

Scout

2.5L Hybrid
Well-known member
Joined
Jul 17, 2021
Threads
74
Messages
411
Reaction score
288
Location
Seattle
Vehicle(s)
XLT
Engine
2.5L Hybrid
I got an update this evening.
Originally scheduled week of March 14th
1st update email last week was a delay to April 4th.
Tonight's update was a move up a week to March 28th.

Let's see what's next.
Fingers crossed you get moved up sooner
 

Hoagus

2.5L Hybrid
Well-known member
Joined
Jan 27, 2022
Threads
14
Messages
922
Reaction score
1,326
Location
Sacramento, CA
Vehicle(s)
‘02 Ranger, ‘22 Mav XL
Engine
2.5L Hybrid
XL hybrid got bumped 3/7 to 3/14.
 

flyjum

2.5L Hybrid
Well-known member
Joined
Jul 28, 2021
Threads
9
Messages
162
Reaction score
255
Location
Arizona
Vehicle(s)
Corvette
Engine
2.5L Hybrid
Yupe bumped again. I suspect we will keep getting bumped for a while maybe into May
 

schum173

Member
First Name
Aaron
Joined
Aug 9, 2021
Threads
2
Messages
13
Reaction score
16
Location
34953
Vehicle(s)
Honda CR-V, 1972 Corvette Stingray
I got an update this evening.
Originally scheduled week of March 14th
1st update email last week was a delay to April 4th.
Tonight's update was a move up a week to March 28th.

Let's see what's next.
Same here. Was scheduled for 3/14, then pushed to 4/4, and tonight moved up to 3/28.

Hybrid, Lariat, 1st edition.
 

Sponsored

KCHahn

2.5L Hybrid
Well-known member
First Name
Keith
Joined
Jun 27, 2021
Threads
14
Messages
307
Reaction score
435
Location
Colorado
Vehicle(s)
Currently drive a 2001 Ford Range Edge 2WD
Engine
2.5L Hybrid
Also got notice tonight, that my build went from April 4, to March 21. Started with March 7, then April 4.
 

JSanchez

2.0L EcoBoost
Well-known member
First Name
Jorge
Joined
Oct 6, 2021
Threads
1
Messages
67
Reaction score
34
Location
Los Angeles
Vehicle(s)
1996 Suburban C1500
Engine
2.0L EcoBoost
Just got the email from Ford, new build date February 21. Went from January 31 to February 7 then the 14 now the 21st. Ordered June 21, XLT hybrid no lux no extras.
super disappointing
I had a build week for the 21st then build week starting Feb. 14, with a build date for the 17th. Then today it was pushed to March 7. A few of my customers builds have been jumping around as well. One being a transit. Pretty annoying but good since Ford jacked up their rate from 1.9 to 2.9 for 60 months.
 

Egz

2.5L Hybrid
Well-known member
Joined
Sep 14, 2021
Threads
11
Messages
418
Reaction score
938
Location
Fredericksburg, VA
Vehicle(s)
2022 Maverick Hybrid Lariat, 1967 Fairlady
Engine
2.5L Hybrid
2/21 -> 3/28 -> 3/5

Production roulette
 

FriscoTXJoe

2.5L Hybrid
Banned
Banned
First Name
Joe
Joined
Aug 25, 2021
Threads
27
Messages
983
Reaction score
2,367
Location
75033
Vehicle(s)
2022 Maverick Lariat
Engine
2.5L Hybrid
Clubs
 
I went from 2/14 to 3/7. Tonight I get email, it’s moved up to 2/21. Hybrid lariat with lux
Kinda the same.
2/28
3/28
3/14

Same vehicle trim.
 

Tuckinnuts

Member
First Name
Zach
Joined
Dec 19, 2021
Threads
0
Messages
10
Reaction score
6
Location
Usa
Vehicle(s)
Maverick
Got email saying mine moved up was week of 21st

Ford Maverick Just got build date pushed for third time FB3FA7D9-EE0F-420A-986E-094DC46B3D83
 

schum173

Member
First Name
Aaron
Joined
Aug 9, 2021
Threads
2
Messages
13
Reaction score
16
Location
34953
Vehicle(s)
Honda CR-V, 1972 Corvette Stingray
And build week changed again.
3/14 -> 4/4 -> 3/28 -> 3/21
Sponsored

 
 




Top