- First Name
- Ron
- Joined
- Feb 21, 2024
- Threads
- 7
- Messages
- 361
- Reaction score
- 347
- Location
- Finleyville PA
- Vehicle(s)
- 2023 Maverick Hybrid Lariat
- Engine
- 2.5L Hybrid
Thank you sir!!Don't hesitate. Get em. I've done them twice, mine and my buddies. 1st time 1 hour. The first 45min to educate and familiarize myself, then the other 3 in 15 minutes. I always use a heat gun on any 3m install, but not necessary if above, I'd say 70°. Second time on my buddies, 30 minutes. Try to reuse oem clips, a bit stronger, but not a deal breaker. If you need mud flaps I recommend doing them at the same time. I have both from @MABETT .
Sponsored