Sponsored

Hybrid orders getting delayed to later dates.

MomaK61

Active member
Joined
Aug 14, 2021
Threads
2
Messages
43
Reaction score
37
Location
34120
Vehicle(s)
Ford F250, Subaru Ascent
I know it might suck to have your build date moved back. But hey at least you got one. So many of us still no news no build date.. Just crickets..
Sponsored

 

mamboman777

2.5L Hybrid
Well-known member
First Name
Josh
Joined
Aug 3, 2021
Threads
111
Messages
3,465
Reaction score
11,751
Location
NRH, TX
Vehicle(s)
2012 Ford Focus, 2022 Ford Maverick
Engine
2.5L Hybrid
Ford Maverick Hybrid orders getting delayed to later dates. Skeletor Facts 03102021071910
 

MarkG

Well-known member
First Name
Mark
Joined
Jul 15, 2021
Threads
14
Messages
253
Reaction score
550
Location
Dallas TX
Vehicle(s)
Subaru Forester
Ford has hybrids that have been built and are awaiting the EPA certification so that they can be sold. It wouldn't make much sense to keep stacking them up.

A delayed build just means it won't be sitting outside in the elements until it can be shipped.
 

mamboman777

2.5L Hybrid
Well-known member
First Name
Josh
Joined
Aug 3, 2021
Threads
111
Messages
3,465
Reaction score
11,751
Location
NRH, TX
Vehicle(s)
2012 Ford Focus, 2022 Ford Maverick
Engine
2.5L Hybrid
Ford has hybrids that have been built and are awaiting the EPA certification so that they can be sold. It wouldn't make much sense to keep stacking them up.

A delayed build just means it won't be sitting outside in the elements until it can be shipped.
I'm going to be shocked if the EPA ball doesn't drop on the 5th with everything else. I think something else is going on with the eCVT that's slowing things.

That being said, I've been wrong before and I'll be wrong again. 🤷‍♂️ It's all speculation. I can't control what I can't control.
 

bombast

2.5L Hybrid
Well-known member
Joined
Aug 24, 2021
Threads
4
Messages
663
Reaction score
1,356
Location
Pennsyltucky
Vehicle(s)
2022 Ford Maverick XL, Hybrid
Engine
2.5L Hybrid
I'm going to be shocked if the EPA ball doesn't drop on the 5th with everything else. I think something else is going on with the eCVT that's slowing things.

I suspect there must be something wrong in the supply chain for the hybrid. Ford seems perfectly content letting unfinished F150s stack up in the desert like cordwood, not sure why they wouldn't do the same with Mavericks that are complete and could be shipped off as soon as someone in the EPA signs the form.
 

Sponsored

MLowe05

2.5L Hybrid
Well-known member
Joined
Oct 1, 2021
Threads
7
Messages
2,471
Reaction score
4,282
Location
GA
Vehicle(s)
2023 Tesla MYP & M3RWD
Engine
2.5L Hybrid
Supply chain issues should come at no surprise in this current environment. I'm not expecting my hybrid for a year, basically.
 

Mavvy228

2.5L Hybrid
Member
First Name
Gilbert
Joined
Oct 15, 2021
Threads
3
Messages
21
Reaction score
10
Location
Lawton, OK
Vehicle(s)
2020 Honda CRV, 2022 Ford Maverick Lariat
Engine
2.5L Hybrid
Just got an email last night from Ford production date was changed from Nov 8th. To Nov 29th. So about a 20 day delay.

2682FAEA-1EED-4BD7-ADF0-CE26ABA95C76.jpeg
When did you order yours?
Sponsored

 
 




Top