I had three scheduling changes before mine got built....
Sponsored
I've had ten reschedules, latest is July 7th, & I've had my window sticker & VIN since May 31st. We'll see after the seventh if I progress or another push back!so i was scheduled for 6/13, then 6/20 then 6/27 but tracking shows it's still in limbo
i have a VIN # but the window sticker is not available yet
i know i'm not the exception here, just wondering for those who already went through this, on average, how many times
were you rescheduled before it was actually built. thanks
XL, pilot360, hybrid
ordered 9/24/21
Twiceso i was scheduled for 6/13, then 6/20 then 6/27 but tracking shows it's still in limbo
i have a VIN # but the window sticker is not available yet
i know i'm not the exception here, just wondering for those who already went through this, on average, how many times
were you rescheduled before it was actually built. thanks
XL, pilot360, hybrid
ordered 9/24/21