Sponsored

Am I Reading this right?

BradnChristine

2.5L Hybrid
Well-known member
First Name
Brad
Joined
Nov 3, 2021
Threads
43
Messages
2,463
Reaction score
3,077
Location
Wyoming
Vehicle(s)
'23 Maverick Lariat Hybrid (towed); '25 Ranger Lariat; '15 C-Max; '20 Transit RV
Engine
2.5L Hybrid
Goofy Ford just texted me "Your Maverick Lariat build date has been delayed to the week of October 16, 2023". Moved from 11/27/23 to 10/16/23 is reported by Ford as a "delay". Also of note, the tracker says last updated 10/6/23. You'd think by this time their tracking systems would be better...but alas.
Sponsored

 

Glendonovich

2.5L Hybrid
Member
First Name
Glen
Joined
Sep 14, 2023
Threads
0
Messages
10
Reaction score
5
Location
Trenton, NJ
Vehicle(s)
24 XLT HYBRID Cactus Gray
Engine
2.5L Hybrid
Mine went from 10/30 to 11/13. No email or text ☹
It changed 4 days ago, just got message a few minutes ago. Confirming the change. It might have moved so much for something big, maybe shortage of sunroofs?
 

Jamesaol

2.5L Hybrid
Active member
First Name
james
Joined
Aug 11, 2023
Threads
7
Messages
44
Reaction score
50
Location
ormond beach, FL
Vehicle(s)
1928 form model A
Engine
2.5L Hybrid
Clubs
 
It changed 4 days ago, just got message a few minutes ago. Confirming the change. It might have moved so much for something big, maybe shortage of sunroofs?
I literally just received a text 10 minutes ago. Mine is a 2024 Lariat Hybrid with the BAP.
 

BradnChristine

2.5L Hybrid
Well-known member
First Name
Brad
Joined
Nov 3, 2021
Threads
43
Messages
2,463
Reaction score
3,077
Location
Wyoming
Vehicle(s)
'23 Maverick Lariat Hybrid (towed); '25 Ranger Lariat; '15 C-Max; '20 Transit RV
Engine
2.5L Hybrid
I literally just received a text 10 minutes ago. Mine is a 2024 Lariat Hybrid with the BAP.
That BAP being included in early builds seems to be common, but I did see it was now being listed as a constraint for future builds.

Does seem that Hybrid Lariat BAPs seem overly chosen for that first week. Is yours Carbonized Gray as well?
 

Jamesaol

2.5L Hybrid
Active member
First Name
james
Joined
Aug 11, 2023
Threads
7
Messages
44
Reaction score
50
Location
ormond beach, FL
Vehicle(s)
1928 form model A
Engine
2.5L Hybrid
Clubs
 
That BAP being included in early builds seems to be common, but I did see it was now being listed as a constraint for future builds.

Does seem that Hybrid Lariat BAPs seem overly chosen for that first week. Is yours Carbonized Gray as well?
Catus Grey
 

Sponsored

StevenK

2.5L Hybrid
Active member
First Name
Steven
Joined
Jan 31, 2023
Threads
0
Messages
39
Reaction score
35
Location
St. Lucie, FL and Pulaski, VA
Vehicle(s)
Ram 1500, 2017
Engine
2.5L Hybrid
My XL Hybrid just pushed from 10/23 to 11/13.
Shortage of 17" tires? or the Hybrid transmission?
The scheduling office at Hermosillo must be a crazy place!
 

C Lejarza

2.5L Hybrid
Member
First Name
Carlos
Joined
Oct 5, 2023
Threads
0
Messages
7
Reaction score
5
Location
94580
Vehicle(s)
Ford Maverick XTL
Engine
2.5L Hybrid
Clubs
 
I recieved an email on 9/14 that my Maverick was scheduled to be built the week of November 27th.

I just went to the Ford site and entered my VIN/order number and it is now saying it is scheduled for the week of 10/16?

Am I confused or did I get moved up? Anyone else had this happen?

1696859799173.png
Same happened to me dates were a bit off. Once in production everything moves pretty quick build is about a two weeks shipping about two or three weeks and final prep for me was about a week. I did call the dealer and put them on notice that I was tracking just incase they thought about doing anything funny.
 

JBEN110

2.0L EcoBoost
Well-known member
First Name
Jeff
Joined
Nov 10, 2023
Threads
10
Messages
312
Reaction score
163
Location
Canada
Vehicle(s)
Maverick Awd XLT tremor with lux
Engine
2.0L EcoBoost
Clubs
 
you are reading that right that its currently scheduled for the week of the 16th. Its possible they moved it up. There is a good chance it can and will change from that date, but that should be the week they are projecting to build it.

Mine ended up not being built until the following week. My scheduled date was 8/28, but it was not put into production until 9/2 and built on 9/6. Which ended up being the following week. This does not appear to be as common, but can happen, as it did for me. Most things I have seen was it ended up being built a few days around the scheduled build date.

My $0.02 would be to use this link and keep an eye out for when it changes and lots of random numbers/data appear. If all of a sudden you go to the link and you see a ton of data, It means that its actually in production and they doing stuff with it. Most likely this link will have info on it before you get any updates from the pizza tracker that you linked above.

https://www.motorcraftservice.com/AsBuilt
my maverick now says in production but the modules only have the letter G populated. any idea what this means?
 

BradnChristine

2.5L Hybrid
Well-known member
First Name
Brad
Joined
Nov 3, 2021
Threads
43
Messages
2,463
Reaction score
3,077
Location
Wyoming
Vehicle(s)
'23 Maverick Lariat Hybrid (towed); '25 Ranger Lariat; '15 C-Max; '20 Transit RV
Engine
2.5L Hybrid
my maverick now says in production but the modules only have the letter G populated. any idea what this means?
That is the blank. Your modules are not populated yet.
Sponsored

 
 







Top