Sponsored

7-31 build date

John Day

2.5L Hybrid
Active member
First Name
John
Joined
May 7, 2023
Threads
5
Messages
36
Reaction score
29
Location
Alabama
Vehicle(s)
2008 F150
Engine
2.5L Hybrid
Has anyone with a build date around 7-31 received any further info (like the blend email or anything)? I received my build notice on 6-19 for 7-31. CRickets since.
Sponsored

 

Mav_RICK

2.5L Hybrid
Well-known member
First Name
Rick
Joined
Nov 4, 2022
Threads
28
Messages
1,497
Reaction score
1,989
Location
Arizona
Vehicle(s)
Ford F150
Engine
2.5L Hybrid
Has anyone with a build date around 7-31 received any further info (like the blend email or anything)? I received my build notice on 6-19 for 7-31. CRickets since.
Not sure what a blend email is but I’d almost bet the farm your Maverick will get built very close to that 7-31 date.
 

grod

2.5L Hybrid
Well-known member
First Name
Gilbert
Joined
Sep 19, 2022
Threads
12
Messages
122
Reaction score
185
Location
Tujunga, NE San Fernando Valley
Vehicle(s)
2026 Maverick Lariat Hybrid, 2020 Kona SEL
Engine
2.5L Hybrid
Clubs
 
Has anyone with a build date around 7-31 received any further info (like the blend email or anything)? I received my build notice on 6-19 for 7-31. CRickets since.
My email came on 6/15 with a build date of 7/31, changed to 8/5, 8/2 and this week back to 7/31. I've checked the pizza tracker every week. When I see a change, I chat with Ford CS and verify. I think I'm just anxious for my build with the date getting closer.
 

Feldgary53

2.5L Hybrid
Well-known member
First Name
Gary
Joined
Mar 4, 2021
Threads
17
Messages
238
Reaction score
239
Location
Portland,Oregon
Vehicle(s)
‘23 Maverick Lariat Hybrid, ‘13 Porsche 911,’22 Porsche Macan S
Engine
2.5L Hybrid
Mine was originally week of 7/17 then 7/31, 8/1 and now 8/3. Tracker says week of but chat says now day of 8/3. I’ve never received direct communication from Ford since placing order despite info correctly entered at dealer.
We need to be proactive sometimes and do our own research with Ford.
 

Last Truck Ever

2.5L Hybrid
Well-known member
Joined
May 23, 2022
Threads
28
Messages
973
Reaction score
2,094
Location
Alabama
Vehicle(s)
2023 Hybrid Maverick XLT
Engine
2.5L Hybrid
Clubs
 
Similar, got my scheduling email in May, for production week of 7/24. It changed a couple times within that week. Then went into "production" this past Tuesday, 7/18, which I didn't get an email on, just noticed it because I obsessively check the tracker. Thursday, the 20th the window sticker finally showed up. It now says it'll be built 7/25 and that's the date I expect it to, at this point. With you having a 7/31 build date, I'd expect the same/similar sequence of events to start popping for you this week, you're basically a week behind me. I don't expect another Ford email until it goes into build and then shipped/delivery estimate, though as others here have noted the emails sometimes overlap each other, so I'll take all that with a grain of salt and see what I do end up getting.

I'm as anxious as you are -- and excited! Kinda hard to believe it's all really happening, after this long, long wait.
 

Sponsored

OP
OP

John Day

2.5L Hybrid
Active member
First Name
John
Joined
May 7, 2023
Threads
5
Messages
36
Reaction score
29
Location
Alabama
Vehicle(s)
2008 F150
Engine
2.5L Hybrid
Not sure what a blend email is but I’d almost bet the farm your Maverick will get built very close to that 7-31 date.
Per the details on the Tracker Link on this site, we should get this info close to the build time. I have called this the blend email in my head since I read it. That is not an offical term. I also use thingamajiggy alot. Sorry to confuse!

You should get your window sticker about a week before your "blend" date. Blend is the point where the chassis and body meet on the assembly line to go through final assembly. The work on the body and chassis has already begun a few shifts before this date. The blend above shows "2021/10/14" So this Maverick is scheduled to go down final assembly on 10/14.
 

onetequilatwo

2.5L Hybrid
Well-known member
First Name
Steve
Joined
Oct 29, 2021
Threads
15
Messages
859
Reaction score
676
Location
Massachusetts
Vehicle(s)
2022 Hybrid Lariat Maverick and 2019 RAV4
Engine
2.5L Hybrid
Well getting a build day but had to ask customer service for it and dealer, but different dates. Seeing the progress bar popluated with dates is exciting and having it finally built. Then there is tracking it on the rails. The hardest part was from the rail depot to the dealership.

Your almost there, but the closer the date, the more agonizing the wait becomes.
 

Utjazz

2.5L Hybrid
Well-known member
First Name
Robert
Joined
Dec 26, 2022
Threads
14
Messages
55
Reaction score
92
Location
St George, UT
Vehicle(s)
Ford Maverick to be
Engine
2.5L Hybrid
My email came on 6/15 with a build date of 7/31, changed to 8/5, 8/2 and this week back to 7/31. I've checked the pizza tracker every week. When I see a change, I chat with Ford CS and verify. I think I'm just anxious for my build with the date getting closer.
I recognize email from Ford on May 18 saying it will be the week of July 17. Then as it got nearer the date, it was pushed back to week of July 22, then back to week of July 19. On the 11th I was able to see the sticker in the window, and sure enough, it was built July 20..(just two days ago)… so I wouldn’t worry too much of the dates changing a little, based on what I have witnessed.
 

Bob The Builder

2.0L EcoBoost
Well-known member
First Name
Butch
Joined
Dec 2, 2021
Threads
54
Messages
2,597
Reaction score
4,884
Location
Vermont
Vehicle(s)
2020 Jeep Cherokee ** 2023 Mav FX/4
Engine
2.0L EcoBoost
I have a 7-29 build date, the greed dot is filled in for production and the window sticker popped today so things are getting close.
 
 







Top