Sponsored

2025 Production delays??

FreedomPenguin

2.5L Hybrid
Well-known member
Joined
Dec 23, 2024
Threads
14
Messages
1,008
Reaction score
1,133
Location
Dayton
Vehicle(s)
25
Engine
2.5L Hybrid
Could be worse people waited years for the 2022. I wonder if the longer you wait to order the more backed up they get.
different times though, they had production issues/parts supplies issues/and low low price and felt like infinitely money pumping, sales are slowing, part productions are back to norms and cash flow is reducing, so possibly, this will be even production/purchase ratio as people be more hesitant to buy things now vs before
Sponsored

 

JacobEleventeen

2.5L Hybrid
Well-known member
First Name
Jacob
Joined
Nov 7, 2024
Threads
2
Messages
208
Reaction score
202
Location
Moline, IL
Vehicle(s)
2025 Maverick Lariat
Engine
2.5L Hybrid
different times though, they had production issues/parts supplies issues/and low low price and felt like infinitely money pumping, sales are slowing, part productions are back to norms and cash flow is reducing, so possibly, this will be even production/purchase ratio as people be more hesitant to buy things now vs before
I do wonder if the order volume is greater than they expected because 1 month to build is still abnormally slow. I considered just waiting for one on the lot but then you have to deal with dealer add-ons.
 

FreedomPenguin

2.5L Hybrid
Well-known member
Joined
Dec 23, 2024
Threads
14
Messages
1,008
Reaction score
1,133
Location
Dayton
Vehicle(s)
25
Engine
2.5L Hybrid
I do wonder if the order volume is greater than they expected because 1 month to build is still abnormally slow. I considered just waiting for one on the lot but then you have to deal with dealer add-ons.
I saw a post recently, someone's lariat, they ordered like 11/09 and just received it this week. thats 2 months from order date to receive. he is anomaly, but thats CRAZY fast!
 
OP
OP

Skrizzi

2.5L Hybrid
Active member
Joined
Dec 3, 2024
Threads
1
Messages
31
Reaction score
26
Location
Detroit
Vehicle(s)
2025 Maverick Lariat
Engine
2.5L Hybrid
It's been mentioned that some of the job2 changes will be concurrent with job1 production. Looks like the delayed builds are all lariats, which could possibly have the new tailgate skin and pro trailer features. Maybe quality checks or other changes are holding them up?
 

JacobEleventeen

2.5L Hybrid
Well-known member
First Name
Jacob
Joined
Nov 7, 2024
Threads
2
Messages
208
Reaction score
202
Location
Moline, IL
Vehicle(s)
2025 Maverick Lariat
Engine
2.5L Hybrid
I saw a post recently, someone's lariat, they ordered like 11/09 and just received it this week. thats 2 months from order date to receive. he is anomaly, but thats CRAZY fast!
Lol that's kinda a slap in the face. Why would they get theirs before I got mine. I wonder if part of it depends on where you live.
 

Sponsored

Packer Bill

2.0L EcoBoost
Well-known member
First Name
Bill
Joined
Jun 21, 2021
Threads
10
Messages
1,928
Reaction score
2,593
Location
South Dakota
Vehicle(s)
2019 Mazda CX-5, 2025 Ford Maverick
Engine
2.0L EcoBoost
The quality check hold for 4 weeks caused some issues for shipping. I guessing that Ford is almost caught up with shipping of those Mavericks in the quality check hold...
 

JacobEleventeen

2.5L Hybrid
Well-known member
First Name
Jacob
Joined
Nov 7, 2024
Threads
2
Messages
208
Reaction score
202
Location
Moline, IL
Vehicle(s)
2025 Maverick Lariat
Engine
2.5L Hybrid
The quality check hold for 4 weeks caused some issues for shipping. I guessing that Ford is almost caught up with shipping of those Mavericks in the quality check hold...
I ordered early hoping to get it sooner but at this point could have just waited for pro trailer assist. I don't really want or need it but still lol
 

Ozarkbeard

Well-known member
Joined
May 22, 2022
Threads
14
Messages
4,344
Reaction score
5,477
Location
.
Vehicle(s)
.
Engine
Undecided
BTW, I'm still waiting on delivery.
The Tracker dates often change and are not reliable. The important line is the"Shipped" date. If Rail shipped, expect from to to eight weeks from "Shipped" date to actual delivery to dealer. Should be faster by Convoy.

Look at your window sticker to see shipping method.
 

JacobEleventeen

2.5L Hybrid
Well-known member
First Name
Jacob
Joined
Nov 7, 2024
Threads
2
Messages
208
Reaction score
202
Location
Moline, IL
Vehicle(s)
2025 Maverick Lariat
Engine
2.5L Hybrid
The Tracker dates often change and are not reliable. The important line is the"Shipped" date. If Rail shipped, expect from to to eight weeks from "Shipped" date to actual delivery to dealer. Should be faster by Convoy.

Look at your window sticker to see shipping method.
Wow I didn't realize rail was that slow. Mine is convoy with a 4 week ETA but we will see what happens.
 
Sponsored

FeelingMimsy

2.5L Hybrid
New member
First Name
Dave
Joined
Apr 16, 2022
Threads
0
Messages
4
Reaction score
3
Location
Woodinville, WA
Website
www.machineintelligencefoundation.org
Vehicle(s)
2022 Maverick Lariat (Hybrid, Cyber Orange)
Engine
2.5L Hybrid
Could be worse people waited years for the 2022. I wonder if the longer you wait to order the more backed up they get.
I waited exactly a year for my '22. You'd think I'd be patient.

Ordered my '25 Lariat Lux+Moonroof on 8/1. Scheduled for production week 12/16 (3832/3608) , went into production 12/21. As of 1/13, status remains "In Production".
 

JacobEleventeen

2.5L Hybrid
Well-known member
First Name
Jacob
Joined
Nov 7, 2024
Threads
2
Messages
208
Reaction score
202
Location
Moline, IL
Vehicle(s)
2025 Maverick Lariat
Engine
2.5L Hybrid
I waited exactly a year for my '22. You'd think I'd be patient.

Ordered my '25 Lariat Lux+Moonroof on 8/1. Scheduled for production week 12/16 (3832/3608) , went into production 12/21. As of 1/13, status remains "In Production".
If the schedule stays the same I bet it will change to built this week. One thing thing to keep in mind is the built status only shows on timeline it will still say in production on main account page.
 

tag1399

2.5L Hybrid
Member
Joined
Oct 17, 2024
Threads
0
Messages
13
Reaction score
7
Location
NC
Vehicle(s)
2025 Maverick XLT FWD Hybrid
Engine
2.5L Hybrid
2025 Lariat hybrid, 4k tow package:

08/15/24 order date with confirmation

01/06/25 scheduled build week, was scheduled around December 11

01/02/25 in production, window sticker shows 125/2327 so it should be produced early in the week.

As of today (01/12/25) it still shows in production and the as-built tracker shows no modules alive. Are all the trackers out of date, or are there production delays? Anybody else waiting for this week's production to show built?
I'm still showing "in production" on 1/11 but now I have modules AND a Tear Tag. Progress! Yours can't be far behind since it's only about 100 further down the line from mine. For the record, mine is an XLT so I don't know that it's necessarily trim-dependent.

If I had to guess, mine will show "built" in the next day or two.

Ford Maverick 2025 Production delays?? Screenshot 2025-01-13 155700
 

DavidB367

2.5L Hybrid
Well-known member
First Name
David
Joined
Nov 26, 2024
Threads
1
Messages
55
Reaction score
62
Location
Texas
Vehicle(s)
2025 Ford Maverick
Engine
2.5L Hybrid
The items to remember are:

- Production does runs based on trim level. They only have so many production lines. Each one needs to be configured for specific parts based on that trim level.
- Production can be delayed by part availability
- Package choices ( like the 4K tow package for example for orders in job 1 ) can delay production.

Factory installed items can also slow delivery based on demand or parts

Basically - you're at the mercy of Ford and sometimes they take their damn sweet time.
 

710-oil-614

2.5L Hybrid
Well-known member
First Name
Cal
Joined
Oct 13, 2021
Threads
27
Messages
6,045
Reaction score
11,866
Location
Ohio...but I'd rather be in Boone.
Vehicle(s)
2025 Hybrid AWD Lariat
Engine
2.5L Hybrid
The items to remember are:

- Production does runs based on trim level. They only have so many production lines. Each one needs to be configured for specific parts based on that trim level.
- Production can be delayed by part availability
- Package choices ( like the 4K tow package for example for orders in job 1 ) can delay production.

Factory installed items can also slow delivery based on demand or parts

Basically - you're at the mercy of Ford and sometimes they take their damn sweet time.
There are two lines at Hermosillo that don't need to be configured for trim. They build Mavericks alongside of Bronco Sports.

There were huge numbers of 4K tow packages produced in job 1. I already have my 2025 Hybrid Lariat AWD w/4K tow and they are still in Job 1
Sponsored

 
 







Top