- First Name
- Greg
- Joined
- Dec 1, 2022
- Threads
- 5
- Messages
- 112
- Reaction score
- 131
- Location
- New Hampshire
- Vehicle(s)
- 2025 Oxford White LOBO, Honda Element SC
- Engine
- 2.0L EcoBoost
Very excited to see them shipping!
Sponsored
My dates are practically the same as yours until we get to "Built." Maybe the plant workers are just sick of shipping green ones by now and are picking out the other colors first....Ordered my XLT Hybrid 8/1/24 (I think my salesman didn't enter the order until 8/2), had a build week of 11/18/24, built on 11/21/24, and shipped 12/12/24 (yesterday). They're estimating 1/2/25 - 1/8/25.
![]()
In my experience, ETA are sometimes correct and other times not. Too many variables can affect delivery...Historically, are the approximate delivery dates correct? Mine states:
Estimated Delivery
01/09/2025 - 01/15/2025
ThanksIn my experience, ETA are sometimes correct and other times not. Too many variables can affect delivery...
My Lariat Hybrid has shipped as well. Ordered 8/20. ETA to Vancouver Canada mid to late January.Thanks
My Tremor is showing "in production 11/15" for weeks.....UGHAnother thought for the folks on this thread: Has anyone received notification that a Tremor was either built or shipped? I have not seen any evidence of Tremors beyond" in production". Thanks in advance.
I am sure it has been built. It is now waiting on the back lot to be shipped. Ford built over 10,000 trucks while the quality check hold was in place.My Tremor is showing "in production 11/15" for weeks.....UGH
Yes, the closer you are to the border crossing between the US and Mexico (Nogales/Tucson), and the closer your dealership is to the closest automotive rail yard in the US (El Mirage for example), the faster you will see your truck. In theory.Mane I’m wrong, but wouldn’t people closer to Mexico get their Mavericks first? I’m guessing Tucson, Phoenix, LA, Albuquerque (thank you spelled checker), and El Paso will be first, but maybe there are other factors.
Mine tooMy Tremor is showing "in production 11/15" for weeks.....UGH
I would plan for a delivery of roughly anywhere between 2:00 to 8 weeks from ship date.Historically, are the approximate delivery dates correct?