Sponsored

Has anyone received a hybrid maverick yet ?

bscarpenter

2.5L Hybrid
Well-known member
First Name
BC
Joined
Jun 17, 2021
Threads
8
Messages
62
Reaction score
55
Location
DubTown OH
Vehicle(s)
2022 Ford Maverick. XL Hybrid, 360, manual slider,
Engine
2.5L Hybrid
I just got an email tonight that my build date for my XL hybrid was changed from 11/8 to 11/29!
Sponsored

 

STARCOMMTREY1

2.5L Hybrid
Well-known member
First Name
Trey
Joined
Aug 6, 2021
Threads
77
Messages
2,421
Reaction score
6,539
Location
Boligee, AL
Vehicle(s)
F350, Ultra Classic, Versa Note and soon to be Mav
Engine
2.5L Hybrid
And shipping for your build will be on hold for at least a year. That's what happens when you brag about getting TWO build dates. Karma's a bitch. 😉
Hey hey hey......I have been more than welcoming to anyone who wants the second can have it
 

Nathan

Well-known member
First Name
Nathan
Joined
Sep 16, 2021
Threads
2
Messages
61
Reaction score
169
Location
Greenfield, Indiana
Vehicle(s)
PHEV Fusion, Hybrid Fusion, Mustang GT, Miata

gpettit77

New member
First Name
glenn
Joined
Sep 9, 2021
Threads
0
Messages
1
Reaction score
0
Location
California
Vehicle(s)
Maverick
I ordered my hybrid in late June early July. They have scheduled mine. I was told that any hybrid will be released on Dec 8th and shipped later.
 

Sponsored

DryHeat

2.5L Hybrid
Well-known member
First Name
DryHeat
Joined
Aug 18, 2021
Threads
8
Messages
1,556
Reaction score
3,379
Location
Arizona
Vehicle(s)
Jeep Patriot
Engine
2.5L Hybrid
I was told that any hybrid will be released on Dec 8th and shipped later.
Here's my understanding of the process:

Shortly after hybrids are born, they are released into the wild for a period of time. This allows them to graze in the welcoming Sonoran Desert and build up the necessary oils and fluids, while their hides toughen in the desert sun so they can resist scratches and dents.

Once their suspensions have fully developed and their once-tender tires have been toughened by the rocky soil, they are corralled, branded with EPA stickers, and made ready for shipping.

Only then are they ready for the perilous trip north toward their future homes.
 

Lone Star Proud

2.5L Hybrid
Well-known member
First Name
William
Joined
Aug 31, 2021
Threads
17
Messages
592
Reaction score
1,469
Location
Central Texas
Vehicle(s)
Ford Maverick XLT
Engine
2.5L Hybrid
Here's my understanding of the process:

Shortly after hybrids are born, they are released into the wild for a period of time. This allows them to graze in the welcoming Sonoran Desert and build up the necessary oils and fluids, while their hides toughen in the desert sun so they can resist scratches and dents.

Once their suspensions have fully developed and their once-tender tires have been toughened by the rocky soil, they are corralled, branded with EPA stickers, and made ready for shipping.

Only then are they ready for the perilous trip north toward their future homes.
We can only hope they reproduce while they're at it and the young mature quickly.
 

mikebass57

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Jul 23, 2021
Threads
1
Messages
73
Reaction score
52
Location
Tecumseh Kansas
Vehicle(s)
Maverick Lariat hybrid
Engine
2.5L Hybrid
Mine is built. Shipping on hold
I’m just wondering with the low number of hybrids being built so far. I’m thinking if they’ve made a bunch of them and because they can’t sell them yet they just park them in the desert. Hopefully soon will all get emails that they’ve all been completed at the same time.
 

martyi48

2.5L Hybrid
Well-known member
First Name
Marty
Joined
Jun 9, 2021
Threads
11
Messages
208
Reaction score
276
Location
East Texas
Vehicle(s)
Maverick
Engine
2.5L Hybrid
I ordered a Lariat hybrid and got confirmation from Ford June 23. Not a word since. It's just an extra vehicle so when it gets here it gets here but I doubt I will see it before spring.
 
Sponsored

Lone Star Proud

2.5L Hybrid
Well-known member
First Name
William
Joined
Aug 31, 2021
Threads
17
Messages
592
Reaction score
1,469
Location
Central Texas
Vehicle(s)
Ford Maverick XLT
Engine
2.5L Hybrid
I just got an email tonight that my build date for my XL hybrid was changed from 11/8 to 11/29!
I got one that said your production schedule has changed from "Who know when" to "Your guess is as good as our's".
 
 




Top