Sponsored

Eight months have passed and still no Maverick.

Syntax Error

2.5L Hybrid
Well-known member
Joined
Sep 12, 2022
Threads
15
Messages
707
Reaction score
1,093
Location
SoCal
Vehicle(s)
2023 Lariat Hybrid Carbonized Grey
Engine
2.5L Hybrid
Clubs
 
Ordered my next XLT 9/15/22 like 1000's of others. I just found out from my sales person that I am a priority 11. It seems there are a lot of priority 10's and 19's out there with no scheduling after 8 months. Curious here. What is the actual purpose of a priority number? I get the restraints implications but that doesn't explain the practical reasoning of having a priority number at all. Thanks
Priority code just means it's your dealership's "line" in which orders will be looked at by Ford for scheduling, within constraints. So if order A is priority 10, and order B is prioirty 11, order A will be looked at and scheduled first before order B, assuming no constraints. But once you add in constraints, then a heavily constrained prioirity code 10 order (call it order C) will be skipped and Ford will schedule order B instead.

This is all within the particular dealership, so it's irrelevant what other dealerships assign as priority codes as it won't affect your particular dealer's queue of orders.
Sponsored

 

BruceK

2.0L EcoBoost
Well-known member
First Name
Bruce
Joined
Jun 2, 2022
Threads
9
Messages
59
Reaction score
52
Location
Minnesota
Vehicle(s)
2014 Cruze, 1964 Mercury, 2022 Maverick
Engine
2.0L EcoBoost
Eight months have passed and still no Maverick. Has anyone received their Maverick that had a priority code of 19! tia
don’t feel bad. I waited 16 months, 501 days total before I got delivery. It will arrive eventually. Be patient.
 

Amarant59

2.5L Hybrid
Member
First Name
Casey
Joined
Sep 16, 2022
Threads
12
Messages
24
Reaction score
7
Location
Athens, GA
Vehicle(s)
Maverick
Engine
2.5L Hybrid
Ordered mine in September. Just got it 3 days ago. Hybrid XL with only hitch and 110v addon. Don’t give up hope
 

Canipeb

2.5L Hybrid
Member
First Name
Carol
Joined
Nov 22, 2021
Threads
0
Messages
21
Reaction score
7
Location
Williamsburg, Va
Vehicle(s)
2023Maverick Hybrid Lariat (on order).
Engine
2.5L Hybrid
Was told everything at my dealership was 19, too, except a couple rollovers. Just got scheduled in today's round. Also 8 months out. Maybe in June for you, hopefully?

As others have said, it's all about dealer allocations.
Why should I be penalized as a Ford customer because of a dealer allotment number. Should be on ordered basis. I have been waiting almost 19 months and still no production date. Ford tells me when I call that it was definitely ordered.
 
  • Angry
Reactions: GRB
OP
OP

Grumpa

2.5L Hybrid
Well-known member
First Name
Bill
Joined
Sep 16, 2022
Threads
39
Messages
499
Reaction score
521
Location
Charlotte NC
Vehicle(s)
Chrysler Pacifica Honda Civic Chevy Sonic
Engine
2.5L Hybrid
Why should I be penalized as a Ford customer because of a dealer allotment number. Should be on ordered basis. I have been waiting almost 19 months and still no production date. Ford tells me when I call that it was definitely ordered.
Wow! That is terrible!
 
  • Sad
Reactions: GRB

Sponsored

Joe Mac

2.0L EcoBoost
Well-known member
First Name
Joe
Joined
Sep 15, 2022
Threads
1
Messages
263
Reaction score
253
Location
Marin
Vehicle(s)
Shelby GT350 F250 Super Duty
Engine
2.0L EcoBoost
Wow! That is terrible!
I orderd mine on 9-15-22. Eco Boost, full size spare tire, 4k and tow pacs, Lariat Lux code 19
It's being built 6-21
 

Timaysz

2.0L EcoBoost
Well-known member
First Name
Tim
Joined
Feb 19, 2022
Threads
22
Messages
238
Reaction score
246
Location
Southern Wi
Vehicle(s)
Ford explorer sport trac
Engine
2.0L EcoBoost
xlt, area 51, xlt pkgf, mud guards, drop in bed liner, 360, 4 pin and soft cover. BTW, I am told I am good to go but not schedued.
Drop the mud flaps and ur odds with greatly increase.. I had the mud flaps on my 22 order and my salesman said that's prob why I didn't get a 22 had to reorder for a 23... Had them take them off the order and got scheduled in the beginning of Nov. For a end of Dec. Build that got pushed to the beginning of Jan.. Cuz of the holidays
Mud flaps are one of the things that have the highest constraints
Last I looked
Sponsored

 
 







Top