- First Name
- Dan
- Joined
- Feb 9, 2023
- Threads
- 8
- Messages
- 119
- Reaction score
- 186
- Location
- SouthEast Wisconsin
- Vehicle(s)
- 2024 Mav Lariat Hybrid, 2015 Hyundai Santa Fe
- Engine
- 2.5L Hybrid
- Thread starter
- #1
This post is mainly for people who ordered a MY23 Hybrid Lariat when the order banks were open for the very short time, September 15-20, 2022.
From what I read on the forum, some Hybrid Lariats rollover MY22 to MY23 are getting built. But, I'd like to hear from anyone whose has a newer, non-rollover Hybrid Lariat, built or scheduled.
I ordered a Hybrid Lariat with Lux, 360, 360A, moonroof and SIBL on Sept 17, 2022. At the time, the dealer said expect a 5-8 month wait. Since reading many of the posts here, my expectations changed to waiting a year or more.
Recently, I talked to my sales person and he stated I have less than a 20% chance of getting one this year and may be looking at a MY24 rollover. The 3 big reasons are: #1 HYBRID (Ford only plans or has capacity to build 50% of all hybrids ordered) #2 Lariats (supply chain, chips) and #3 Dealer allocation of hybrids. My dealer is only allocated about 10% of what they ordered.
He suggested I think about changing to the 2.0 EB engine and downgrading to a XLT. He stated that even when Ford adds a 3rd shift to the Hermosillo plant, he believes it will be for mostly 2.0 EB XLTs.
I went with the Maverick because of the Hybrid and i want the Lariat because I'm getting old, almost 70 and i deserve some luxury in my retirement.
I know we all have gripes about how Ford has handled this unfortunate situation. Again, my intention here is for people to post that they ordered in Sept, 2022 and their Hybrid Lariats are built or are scheduled for production. It may give those of us with long waits ahead, some hope.
Thank you
From what I read on the forum, some Hybrid Lariats rollover MY22 to MY23 are getting built. But, I'd like to hear from anyone whose has a newer, non-rollover Hybrid Lariat, built or scheduled.
I ordered a Hybrid Lariat with Lux, 360, 360A, moonroof and SIBL on Sept 17, 2022. At the time, the dealer said expect a 5-8 month wait. Since reading many of the posts here, my expectations changed to waiting a year or more.
Recently, I talked to my sales person and he stated I have less than a 20% chance of getting one this year and may be looking at a MY24 rollover. The 3 big reasons are: #1 HYBRID (Ford only plans or has capacity to build 50% of all hybrids ordered) #2 Lariats (supply chain, chips) and #3 Dealer allocation of hybrids. My dealer is only allocated about 10% of what they ordered.
He suggested I think about changing to the 2.0 EB engine and downgrading to a XLT. He stated that even when Ford adds a 3rd shift to the Hermosillo plant, he believes it will be for mostly 2.0 EB XLTs.
I went with the Maverick because of the Hybrid and i want the Lariat because I'm getting old, almost 70 and i deserve some luxury in my retirement.
I know we all have gripes about how Ford has handled this unfortunate situation. Again, my intention here is for people to post that they ordered in Sept, 2022 and their Hybrid Lariats are built or are scheduled for production. It may give those of us with long waits ahead, some hope.
Thank you
Sponsored