Sponsored

My production date got moved up a week

TGTBTU

2.0L EcoBoost
Active member
First Name
TGTBTU
Joined
Sep 19, 2022
Threads
9
Messages
38
Reaction score
30
Location
Orlando, FL
Vehicle(s)
aa
Engine
2.0L EcoBoost
To my pleasant surprise, I received an email from Ford on 02/07/2023 at 8:17pm that the production of my Maverick Lariat has been moved up by a week. The previous production date was 02/28/2023, now it's 02/20/2023. Original order date was 09/15/2022.

Crossing my fingers...!
Sponsored

 

MMCWhitehead

2.0L EcoBoost
Member
First Name
Jeff
Joined
Sep 17, 2022
Threads
1
Messages
10
Reaction score
25
Location
PA
Vehicle(s)
'23 Maverick Lariat Alto Blue, picked up 4/28/23,
Engine
2.0L EcoBoost
I received a similar email. Mine was scheduled for the week of 3/13, then pushed back to 3/20, then to 3/27... but now Ford moved it up to 3/20. We should start a new game- Build Week Bingo ;-)
 

MistiT

2.0L EcoBoost
Well-known member
First Name
Misti
Joined
Nov 12, 2021
Threads
3
Messages
96
Reaction score
520
Location
Houston, Tx
Vehicle(s)
2023 Ford Maverick XLT
Engine
2.0L EcoBoost
Clubs
 
Mine was originally scheduled for 2/24 then moved to 2/22, NGL I check the tracker everyday to see if any changes. The wait is 100 x harder now that its scheduled..
 

strtrkstr

2.5L Hybrid
Well-known member
First Name
Patrick
Joined
Sep 18, 2022
Threads
2
Messages
109
Reaction score
132
Location
Springfield, IL
Vehicle(s)
2023 Ford XLT Maverick Hybrid
Engine
2.5L Hybrid
mine was scheduled for 2/20, then moved up to 2/13, now moved to 2/21.
 

Sponsored

Maverickman74

2.0L EcoBoost
Well-known member
First Name
Shane
Joined
Dec 8, 2021
Threads
65
Messages
5,598
Reaction score
7,793
Location
Maui HI
Vehicle(s)
96 Bronco, 91 Comanche, 93 ZJ, 80 Eagle, Bicycle
Engine
2.0L EcoBoost
Clubs
 
Mine did the same only it was 3/27 to 3/20.
 

kpomeraning

2.5L Hybrid
Well-known member
First Name
Keith
Joined
Nov 23, 2021
Threads
0
Messages
108
Reaction score
142
Location
Akron, OH
Vehicle(s)
'22 Mav on order, '17 Focus, '16 Focus, '09 Fusion
Engine
2.5L Hybrid
Clubs
 
Mine was 3/20 and then moved to 3/13 and then back to 3/20... I'm just going to wait until I learn it's on a delivery truck to get excited.
 

MaverNick

2.5L Hybrid
Member
First Name
Nick
Joined
Sep 17, 2022
Threads
2
Messages
12
Reaction score
6
Location
Southold, NY
Vehicle(s)
2005 Toyota Tundra, 1988 F-150, 1960 F-100
Engine
2.5L Hybrid
Yesterday (2/8/2023) I visited the Ford Vehicle Order Tracking site. I had a production week of 3/3/23 as of Tuesday afternoon.
(2/7/2023). When I checked it this time, there isn’t a production date listed.
Ford Maverick My production date got moved up a week Ford Order 2023-01-28
 
Last edited:

doubletee2

2.5L Hybrid
Member
First Name
Travis
Joined
Jul 30, 2022
Threads
0
Messages
6
Reaction score
6
Location
Orlando, FL
Vehicle(s)
2023 Hybrid
Engine
2.5L Hybrid
Yesterday (2/8/2023) I visited the Ford Vehicle Order Tracking site. I had a production week of 3/3/23 as of Tuesday afternoon.
(2/7/2023). When I checked it this time, there isn’t a production date listed.
Same here. Had production date of 3/20 on 1/26 that disappeared 2 days later from the tracker. Happy to have a VIN though. Still realize that it doesn't mean the truck will be built any time soon or ever for that matter, LOL!

Now (2/11/23) it's back again with date one day later 3/21. WTH?
 
Last edited:

strtrkstr

2.5L Hybrid
Well-known member
First Name
Patrick
Joined
Sep 18, 2022
Threads
2
Messages
109
Reaction score
132
Location
Springfield, IL
Vehicle(s)
2023 Ford XLT Maverick Hybrid
Engine
2.5L Hybrid
To my pleasant surprise, I received an email from Ford on 02/07/2023 at 8:17pm that the production of my Maverick Lariat has been moved up by a week. The previous production date was 02/28/2023, now it's 02/20/2023. Original order date was 09/15/2022.

Crossing my fingers...!
we are scheduled the same week! mine now says 2/21, I am only assuming they have a Tuesday listed because they are more certain that that is when it will actually go into production. I don't think they observe MLK Day in Mexico.
 
Sponsored

ejouie

2.0L EcoBoost
Well-known member
First Name
Evan
Joined
Sep 21, 2022
Threads
10
Messages
379
Reaction score
476
Location
Newnan, GA
Vehicle(s)
'23 Ford Maverick, Atlas Blue, FWD, EcoBoost, XLT
Engine
2.0L EcoBoost
Clubs
 
I am confused. Why did mine change from " Scheduled Week Of 2/20" to " Scheduled Week Of 2/24". What's the difference? It's the same week.
 

Flight Test

2.0L EcoBoost
Well-known member
First Name
Joe
Joined
Jul 23, 2022
Threads
8
Messages
537
Reaction score
710
Location
DFW
Vehicle(s)
Corvettes
Engine
2.0L EcoBoost
Clubs
 
I am confused. Why did mine change from " Scheduled Week Of 2/20" to " Scheduled Week Of 2/24". What's the difference? It's the same week.
Mine was 20-Feb., changed to 23-Feb. I can't get a definitive answer to what it means and the Ford chat babe was useless.
 

strtrkstr

2.5L Hybrid
Well-known member
First Name
Patrick
Joined
Sep 18, 2022
Threads
2
Messages
109
Reaction score
132
Location
Springfield, IL
Vehicle(s)
2023 Ford XLT Maverick Hybrid
Engine
2.5L Hybrid
Mine was 20-Feb., changed to 23-Feb. I can't get a definitive answer to what it means and the Ford chat babe was useless.
I am confused. Why did mine change from " Scheduled Week Of 2/20" to " Scheduled Week Of 2/24". What's the difference? It's the same week.
The only thing I can think of is they are able to pin your production date to a specific date within the week. Mine is sitting at 2/21. Or there is always the possibility that they don't even know.
 

Ranch

2.0L EcoBoost
Well-known member
First Name
Bob
Joined
Sep 19, 2022
Threads
0
Messages
928
Reaction score
1,011
Location
Sacramento CA
Vehicle(s)
2023 Marverick FX4 4K
Engine
2.0L EcoBoost
My tracker finally shows the schedule date after a couple of weeks wait. Went from the week of March 27th on the email to the week of April 1st on the tracker. Same week but goes from Monday to Saturday.
 

MaverNick

2.5L Hybrid
Member
First Name
Nick
Joined
Sep 17, 2022
Threads
2
Messages
12
Reaction score
6
Location
Southold, NY
Vehicle(s)
2005 Toyota Tundra, 1988 F-150, 1960 F-100
Engine
2.5L Hybrid
Yesterday (2/8/2023) I visited the Ford Vehicle Order Tracking site. I had a production week of 3/3/23 as of Tuesday afternoon.
(2/7/2023). When I checked it this time, there isn’t a production date listed.
Ford Order 2023-01-28.PNG
Just following up. I called Ford Customer Service @ 1 (800) 334-4375 and they looked up my order. My new build week date is 3/6/2023.
I’d suggest that if your dealer is not sharing the information you want in a timely manner try calling Ford Customer Service @ 1 (800) 334-4375. Have your order number and the last eight digits of your Mav’s VIN and ask them for an update.
Ford Maverick My production date got moved up a week WO Ford Order 2023-02-10
Sponsored

 
 







Top