Sponsored

Production date moved up??

brdl04

2.5L Hybrid
Well-known member
Joined
Aug 30, 2021
Threads
8
Messages
159
Reaction score
306
Location
Detroit
Vehicle(s)
Expedition
Engine
2.5L Hybrid
I feel like tomorrow will be the day I receive the production email for my Oct. hybrid order.

has anyone gotten a production date and had it move up to a sooner date ? Curious is all.
Sponsored

 

Deleted member 5597

Guest
I ordered a hybrid XLT with CP360 and the lux pkg on 19 Oct. I was read the memo Ford sent to all dealers by the sales manager, about constraints, and about removing both packages in order to even have a chance of having my order previewed by the regional office.
Since I was late to the game in ordering, I was told that my order may not make this model year. Customers are still waiting from their Jul-Aug orders.
 

Spectrasonic

2.0L EcoBoost
Well-known member
Joined
Aug 10, 2021
Threads
5
Messages
82
Reaction score
129
Location
Eastern USA
Vehicle(s)
2019 Audi A5 Sportback
Engine
2.0L EcoBoost
Yes, I was originally scheduled for 2/28 and had it moved up two weeks to 2/14. However my build was on a chip hold for 4 weeks so it wasn't built until 3/13.
 
OP
OP

brdl04

2.5L Hybrid
Well-known member
Joined
Aug 30, 2021
Threads
8
Messages
159
Reaction score
306
Location
Detroit
Vehicle(s)
Expedition
Engine
2.5L Hybrid
I ordered a hybrid XLT with CP360 and the lux pkg on 19 Oct. I was read the memo Ford sent to all dealers by the sales manager, about constraints, and about removing both packages in order to even have a chance of having my order previewed by the regional office.
Since I was late to the game in ordering, I was told that my order may not make this model year. Customers are still waiting from their Jul-Aug orders.
Are you trying to ruin my mojo?
 

Renho17

2.5L Hybrid
Well-known member
First Name
Ren
Joined
Aug 12, 2021
Threads
1
Messages
464
Reaction score
533
Location
CA
Vehicle(s)
Hybrid Mav
Engine
2.5L Hybrid
First build date 3/14
Moved back to 4-11
Moved up to 4/4
Moved up to 3/28
Went into production yesterday 3/22
 

Sponsored

Deleted member 5597

Guest
And this is exactly why I gave Ford 90 days to give me a production date. The 90 days was up on 19 January, then I began to be proactive and searched the southeast region for a hybrid of any trim level that a customer canceled. Within a week, I found a hybrid XL that was the same color as I ordered, had a tonneau cover, and spray in bed liner. I jumped at the chance to buy it. On 27 January, I flew to Charlotte and purchased it, and drove home 546 miles. At this point in the game, I’m not counting on my order anytime soon!
 
OP
OP

brdl04

2.5L Hybrid
Well-known member
Joined
Aug 30, 2021
Threads
8
Messages
159
Reaction score
306
Location
Detroit
Vehicle(s)
Expedition
Engine
2.5L Hybrid
And this is exactly why I gave Ford 90 days to give me a production date. The 90 days was up on 19 January, then I began to be proactive and searched the southeast region for a hybrid of any trim level that a customer canceled. Within a week, I found a hybrid XL that was the same color as I ordered, had a tonneau cover, and spray in bed liner. I jumped at the chance to buy it. On 27 January, I flew to Charlotte and purchased it, and drove home 546 miles. At this point in the game, I’m not counting on my order anytime soon!
Great work. I've made calls to probably 5 dealerships and all the Hybrids were orders that were already sold. Ill keep trying!
 

The Weatherman

2.0L EcoBoost
Well-known member
First Name
Dean
Joined
Jul 20, 2021
Threads
21
Messages
2,470
Reaction score
3,542
Location
KY
Vehicle(s)
2022 Maverick Lariat Lux FX4 4K x 2
Engine
2.0L EcoBoost
8/26/21 order dt
4/25/22 build dt moved to
4/18/22 build dt

I expect it will move again.
Sponsored

 
 







Top