Sponsored

Stuck "In production" for 2 weeks and 6 days

Mxer97

2.5L Hybrid
Well-known member
First Name
R
Joined
Oct 4, 2021
Threads
51
Messages
409
Reaction score
428
Location
H town
Vehicle(s)
2023 mav xlt
Engine
2.5L Hybrid
Anyone else stuck in production? Went into production on December 12th, then trim line stage on the 23rd. Wondering if anyone managed to get built after being stuck. Happy New Year!
Mine was stuck for about 45 days.
Sponsored

 

BradnChristine

2.5L Hybrid
Well-known member
First Name
Brad
Joined
Nov 3, 2021
Threads
43
Messages
2,463
Reaction score
3,077
Location
Wyoming
Vehicle(s)
'23 Maverick Lariat Hybrid (towed); '25 Ranger Lariat; '15 C-Max; '20 Transit RV
Engine
2.5L Hybrid
Doesn't it always end with a "G"? I have many pages of codes, both PCM and BCE. Then at the end it still says:
End of Information
G

Mine has been showing "In production" since 1/12...and the modules were populated some time on 1/13. It still doesn't show "Built", but when I chatted with Ford yesterday, they told me delivery would be 2/2 to 2/8. Seems like it must be built if they think they can get it from Mexico to Wyoming in the next 15-21 days.
UPDATE... I've apparently had my Maverick take 2 trips to the Trim/Mod/body shop (They call it differently each time) since entering production on 1/12, according to Ford this AM. She said it wasn't waiting for chips, and she could see nothing else about why it was still not "built". She seemed to imply that the 2/2-2/8/23 ETA dates were still in the system, but that seems unlikely if it is neither "built" nor "shipped" yet.

Modules and Sync were live and updated by 1/13, but that seems to have little bearing on it being finished. Nothing further in tracking, so it must be stuck in production somewhere in Hermosillo.

Ford's tracking sux.
 

capo99

2.5L Hybrid
Well-known member
First Name
Cam
Joined
Nov 2, 2021
Threads
5
Messages
133
Reaction score
90
Location
Victoria BC Canada
Vehicle(s)
Nissan Kicks
Engine
2.5L Hybrid
Same timeline and situation as you except a Canadain order. Dealer says it’s built and ready for shipping, but tracker says in production. Modules popped a few weeks ago. Asked for the railcard number but no response yet.
 

BradnChristine

2.5L Hybrid
Well-known member
First Name
Brad
Joined
Nov 3, 2021
Threads
43
Messages
2,463
Reaction score
3,077
Location
Wyoming
Vehicle(s)
'23 Maverick Lariat Hybrid (towed); '25 Ranger Lariat; '15 C-Max; '20 Transit RV
Engine
2.5L Hybrid
Same timeline and situation as you except a Canadain order. Dealer says it’s built and ready for shipping, but tracker says in production. Modules popped a few weeks ago. Asked for the railcard number but no response yet.
My salesman said it was "produced", but that doesn't seem to mean anything. They just have to get it from Mexico to Denver on the train, then trucked up to Wyoming.
 

Lou'sBluMav

2.5L Hybrid
Well-known member
First Name
Lou
Joined
Jun 14, 2022
Threads
5
Messages
131
Reaction score
112
Location
Upstate SC
Vehicle(s)
2004 Chevy Colorado(sold Oct) 2018 Subaru Forester
Engine
2.5L Hybrid
Same situation as BnC, a week behind. Order Tracking still shows "In Prodn". Called Marketing this evening. They say "produced" 1/16, on "trim line" 1/17. Only reason I can think of is something on the XLT Lux pkg or CP360 must be the holdup. I can't convince my sales manager to dig into the Vehicle Visibility and share. He says, nothing can be done, just to wait until it shows "shipped". Frustrating, but I think he's right.
 

Sponsored

BradnChristine

2.5L Hybrid
Well-known member
First Name
Brad
Joined
Nov 3, 2021
Threads
43
Messages
2,463
Reaction score
3,077
Location
Wyoming
Vehicle(s)
'23 Maverick Lariat Hybrid (towed); '25 Ranger Lariat; '15 C-Max; '20 Transit RV
Engine
2.5L Hybrid
Same situation as BnC, a week behind. Order Tracking still shows "In Prodn". Called Marketing this evening. They say "produced" 1/16, on "trim line" 1/17. Only reason I can think of is something on the XLT Lux pkg or CP360 must be the holdup. I can't convince my sales manager to dig into the Vehicle Visibility and share. He says, nothing can be done, just to wait until it shows "shipped". Frustrating, but I think he's right.
Waiting wouldn't be so bad if they just wouldn't give us dates and then go quiet after that.
447 days down...
 

BradnChristine

2.5L Hybrid
Well-known member
First Name
Brad
Joined
Nov 3, 2021
Threads
43
Messages
2,463
Reaction score
3,077
Location
Wyoming
Vehicle(s)
'23 Maverick Lariat Hybrid (towed); '25 Ranger Lariat; '15 C-Max; '20 Transit RV
Engine
2.5L Hybrid
Waiting wouldn't be so bad if they just wouldn't give us dates and then go quiet after that.
447 days down...
Now it just changed tonight. While it used to say "In Production 1/12/23", now it says "In Production 1/11/23" and Built 1/12/23. WTH? None of that matches what Ford Chat or the Ford Phone folks told me. At least they haven't forgotten me yet.
 

res0991

2.5L Hybrid
Well-known member
Joined
Oct 10, 2021
Threads
0
Messages
70
Reaction score
72
Location
Orlando, Fl
Vehicle(s)
KIA
Engine
2.5L Hybrid
Confirmed yesterday that my truck arrived at “Industry”. Checked tracker this morning and it says in Final Preparation, but it’s showing 1/8 as the date lol. Wth?

Ford Maverick Stuck "In production" for 2 weeks and 6 days CF488C0A-44C7-4B11-ACEE-92CC1B8B481D
 

Dechion

2.5L Hybrid
Well-known member
First Name
Brad
Joined
Oct 30, 2021
Threads
36
Messages
362
Reaction score
629
Location
Titusville, Fl
Vehicle(s)
2015 Kia Forte
Engine
2.5L Hybrid
I was in the same boat as many here with mine going into production on 1/11 and just staying there.

I checked the pizza tracker just a few minutes ago and I'm now showing as built on 1/12.

Hopefully its the same for lots of us, and the system is finally catching up.
 

JerseyMike

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Oct 27, 2021
Threads
17
Messages
214
Reaction score
365
Location
Belmar NJ
Vehicle(s)
2019 Mazda 3
Engine
2.5L Hybrid
I was in the same boat as many here with mine going into production on 1/11 and just staying there.

I checked the pizza tracker just a few minutes ago and I'm now showing as built on 1/12.

Hopefully its the same for lots of us, and the system is finally catching up.
Yeah. Mine has been showing production since 1/10. Today it shows in production 1/17 and built 1/16. Impressive. 🤣

Ford Maverick Stuck "In production" for 2 weeks and 6 days Screenshot_20230124_072011_Chrom
 
Sponsored

Dechion

2.5L Hybrid
Well-known member
First Name
Brad
Joined
Oct 30, 2021
Threads
36
Messages
362
Reaction score
629
Location
Titusville, Fl
Vehicle(s)
2015 Kia Forte
Engine
2.5L Hybrid
Yeah. Mine has been showing production since 1/10. Today it shows in production 1/17 and built 1/16. Impressive. 🤣

Screenshot_20230124_072011_Chrome.webp
Built before it was in production, maybe doc Brown and his DeLorean were involved 🤔
 

BradnChristine

2.5L Hybrid
Well-known member
First Name
Brad
Joined
Nov 3, 2021
Threads
43
Messages
2,463
Reaction score
3,077
Location
Wyoming
Vehicle(s)
'23 Maverick Lariat Hybrid (towed); '25 Ranger Lariat; '15 C-Max; '20 Transit RV
Engine
2.5L Hybrid
I'm still stuck as "in production 1/12/23." Tracker says it was last updated 1/13/23. I've seen some of the later dates in January moving on in the system, but there seems to be still a bunch of early January stuck "in process." Getting old with zero updates to the "tracker".
 

skadizzle

2.5L Hybrid
Well-known member
Joined
Nov 2, 2021
Threads
46
Messages
2,003
Reaction score
2,135
Location
Orlando, Florida
Vehicle(s)
2023 Ford Maverick Lariat BAP
Engine
2.5L Hybrid
Clubs
 
I'm still stuck as "in production 1/12/23." Tracker says it was last updated 1/13/23. I've seen some of the later dates in January moving on in the system, but there seems to be still a bunch of early January stuck "in process." Getting old with zero updates to the "tracker".
You posted earlier that it moved to in production 1/11 and built on 1/12. Did it revert back and take away the build status? Mine added a scheduled for week of tab that shows 1/12 but it still just says in production 1/13 and nothing else.
 

IanClarke

2.5L Hybrid
Member
First Name
Ian
Joined
Oct 29, 2021
Threads
0
Messages
21
Reaction score
24
Location
Casa Grande AZ
Vehicle(s)
Coda Sedan EV
Engine
2.5L Hybrid
mine finally said built after being in production since 1/17
 

capo99

2.5L Hybrid
Well-known member
First Name
Cam
Joined
Nov 2, 2021
Threads
5
Messages
133
Reaction score
90
Location
Victoria BC Canada
Vehicle(s)
Nissan Kicks
Engine
2.5L Hybrid
I'm still stuck as "in production 1/12/23." Tracker says it was last updated 1/13/23. I've seen some of the later dates in January moving on in the system, but there seems to be still a bunch of early January stuck "in process." Getting old with zero updates to the "tracker".
Still stuck in production myself 01/11/23. Dealer is no help nor is Ford chat.ca. Nothing special about my order that I can see yet lots of similar builds have shipped. Pretty sure it went from production to built and back to production all in a 24 hour period a while back. Another build from my dealer at the same time as mine is getting shipped if not already on the way.
Sponsored

 
 







Top