My salesperson told me my Order placed late Sept/Oct that was previously scheduled, now shows a build week of 1/9/23.
Do I believe it?
I believe that's what they see, for sure.

But I do not believe the date.
At this point it's like some kind of cheating boyfriend.

Ford Maverick Are ALL of the '22 that were scheduled w a VIN now moved to "Jan 9th" build week? I don't believe you
Sponsored

 

BradnChristine

2.5L Hybrid
Well-known member
First Name
Brad
Joined
Nov 3, 2021
Threads
43
Messages
2,463
Reaction score
3,077
Location
Wyoming
Vehicle(s)
'23 Maverick Lariat Hybrid (towed); '25 Ranger Lariat; '15 C-Max; '20 Transit RV
Engine
2.5L Hybrid
My salesperson told me my Order placed late Sept/Oct that was previously scheduled, now shows a build week of 1/9/23.
Do I believe it?
I believe that's what they see, for sure.

But I do not believe the date.
At this point it's like some kind of cheating boyfriend.

I don't believe you.gif
No updated email for me. Still 12/19, and the VIN is still in the tracker.
 

MacMaverick

2.5L Hybrid
Member
First Name
Mike
Joined
Oct 23, 2021
Threads
0
Messages
18
Reaction score
17
Location
Cape Coral, FL
Vehicle(s)
2015 Mustang, 2022 Maverick Hybrid Lariat (ordered
Engine
2.5L Hybrid
Ditto…12/19 prod date and VIN still valid.
 
OP
OP
HybridOnOrder

HybridOnOrder

2.5L Hybrid
Well-known member
First Name
Cee
Joined
Oct 24, 2021
Threads
3
Messages
252
Reaction score
278
Location
Virginia
Vehicle(s)
Going to be: Maverick XLT, Lux PKG, Moonroof, 360
Engine
2.5L Hybrid
Right, me too. I didn't get an email.
People are finding out this mythical date from the Ford CS or their own dealer's info.
My VIN and '22 VIN still shows in the tracker also
 

ForeverWaiting

2.5L Hybrid
Well-known member
Joined
Jan 28, 2022
Threads
6
Messages
97
Reaction score
67
Location
Pennsylvania
Vehicle(s)
None
Engine
2.5L Hybrid
Ordered October 9, 2021...hybrid xlt lux with 360. Assigned VIN early August of 2022. Build date moved 7 times to week of Dec 19th.

Currently have build date for week of January 9, 2023

Ford Maverick Are ALL of the '22 that were scheduled w a VIN now moved to "Jan 9th" build week? Screenshot_20221028-143025~2
 

Sponsored

2022 pushed behind 2023's

2.5L Hybrid
Well-known member
First Name
mike
Joined
Oct 28, 2022
Threads
4
Messages
57
Reaction score
62
Location
ca
Vehicle(s)
maverick
Engine
2.5L Hybrid
Its clear Ford has moved us around many times now (for no reason that we can figure out) and put up Fresh My2023 heavy constrained orders in our spots.

Ford lost a lot of money last quarter.

Add it up
 

npipe07

2.5L Hybrid
Active member
Joined
Jan 25, 2022
Threads
3
Messages
39
Reaction score
48
Location
Illinois
Vehicle(s)
Ford Fiesta
Engine
2.5L Hybrid
Yup. 1/9/23 production week scheduled now here for my XLT Hybrid...Still a 2022 truck according to Ford. ETA though is 11/23/22 so that time machine ford has is impressive. :D
 

MM Mav

2.5L Hybrid
Well-known member
First Name
Amy
Joined
Sep 9, 2022
Threads
18
Messages
1,510
Reaction score
2,680
Location
Great Lakes Region
Vehicle(s)
2023 Hybrid Lariat Luxury w/CP360 + CP360A
Engine
2.5L Hybrid
Sponsored

npipe07

2.5L Hybrid
Active member
Joined
Jan 25, 2022
Threads
3
Messages
39
Reaction score
48
Location
Illinois
Vehicle(s)
Ford Fiesta
Engine
2.5L Hybrid
My one guess is they are still trying to figure out how to handle the 22 vins that got canceled (mainly cause they are still saying my VIN is active although its a 22 MY vin which wouldn't be allowed I thought). Once they do maybe they push those 23 orders to the front of the line and push those scheduled today back citing constraints???? Unlikely....but only way to make me feel okay with this whole mess of a process.. Maybe @fordvideoguy will have some info for us Tuesday?
 

Timothyd

2.5L Hybrid
Well-known member
First Name
Tim
Joined
Nov 10, 2021
Threads
52
Messages
4,119
Reaction score
3,511
Location
Illinois
Vehicle(s)
Buick Encore, Miata, motorcycles
Engine
2.5L Hybrid
Clubs
 
Its clear Ford has moved us around many times now (for no reason that we can figure out) and put up Fresh My2023 heavy constrained orders in our spots.

Ford lost a lot of money last quarter.

Add it up
I'm dying to throw $30k at them.
 

Timothyd

2.5L Hybrid
Well-known member
First Name
Tim
Joined
Nov 10, 2021
Threads
52
Messages
4,119
Reaction score
3,511
Location
Illinois
Vehicle(s)
Buick Encore, Miata, motorcycles
Engine
2.5L Hybrid
Clubs
 
My salesperson told me my Order placed late Sept/Oct that was previously scheduled, now shows a build week of 1/9/23.
Do I believe it?
I believe that's what they see, for sure.

But I do not believe the date.
At this point it's like some kind of cheating boyfriend.

I don't believe you.gif
I don't friggin know what to believe anymore. The more time goes by there's less that can be counted on. You should hook your boyfriend up with my wife. Please.
 

skadizzle

2.5L Hybrid
Well-known member
Joined
Nov 2, 2021
Threads
46
Messages
2,002
Reaction score
2,132
Location
Orlando, Florida
Vehicle(s)
2023 Ford Maverick Lariat BAP
Engine
2.5L Hybrid
Clubs
 
My 22 order that was canceled got a build date of 1/9. Never got an email. My rollover is still unscheduled.
 

GonnaGetItOneDay

2.5L Hybrid
Well-known member
Joined
Jul 3, 2022
Threads
4
Messages
201
Reaction score
342
Location
Spokane WA
Vehicle(s)
Kia Sorento (sold in September)
Engine
2.5L Hybrid
Yup, checked with CS today as well and was also told 1/09/23. No email and VIN still works in the tracker.

Today is the first day that the date that I ordered was blank in the tracker though.

My guess is that they decided to move us all to 01/09 just in case they don't have this clusterfuck figured out by the time scheduling 23s for the week of 12/19 occurs.