- First Name
- PW
- Joined
- Sep 27, 2021
- Threads
- 21
- Messages
- 244
- Reaction score
- 296
- Location
- Asheville NC
- Vehicle(s)
- Chevy S-10
- Engine
- 2.5L Hybrid
- Thread starter
- #31
As of 12am, the rail car was "constructively placed" at Cayce, SC which means CSX couldn't place the rail in a location where it could be immediately offloaded.
About 7 miles from final rail destination in Dixiana SC. Earlier the ETA was by 1am tomorrow night. Now there is no ETA available.
Currently somewhere here in Cayce, SC
About 7 miles from final rail destination in Dixiana SC. Earlier the ETA was by 1am tomorrow night. Now there is no ETA available.
Currently somewhere here in Cayce, SC
Sponsored