I remember seeing somewhere a rough schedule of how long it would take to deliver your Maverick once it started production. Was I dreaming? Or does that exist somewhere? My vehicle is schedule for production the week of 9/20. I was hoping to get a sense of what that means for a delivery date.
Sponsored

 

STARCOMMTREY1

2.5L Hybrid
Well-known member
First Name
Trey
Joined
Aug 6, 2021
Threads
77
Messages
2,421
Reaction score
6,539
Location
Boligee, AL
Vehicle(s)
F350, Ultra Classic, Versa Note and soon to be Mav
Engine
2.5L Hybrid
4 to six weeks later
 

22Mav

Well-known member
Banned
First Name
Jared
Joined
Aug 7, 2021
Threads
5
Messages
358
Reaction score
778
Location
MO
Vehicle(s)
Ford Maverick XLT/Lariat.. Undecided still :O
I remember seeing somewhere a rough schedule of how long it would take to deliver your Maverick once it started production. Was I dreaming? Or does that exist somewhere? My vehicle is schedule for production the week of 9/20. I was hoping to get a sense of what that means for a delivery date.
My dealer said approx. 4 weeks from receipt of actual build date. Whatever your dealer says is probably safe to assume as a fair guess. My dealer has a pretty firm idea on 4 weeks as that's nearly exactly as long as it's taken them to recieve Bronco Sports from build date to dealer lot and those come right out of the same plant. If your dealer's been tracking their stats on the Bronco Sport, they should be able to give you a comparable time frame.
 

Lappo424

Well-known member
First Name
Chris
Joined
Jun 13, 2021
Threads
33
Messages
550
Reaction score
748
Location
NJ
Vehicle(s)
Accord - Looking to switch to Maverick XL
I remember seeing somewhere a rough schedule of how long it would take to deliver your Maverick once it started production. Was I dreaming? Or does that exist somewhere? My vehicle is schedule for production the week of 9/20. I was hoping to get a sense of what that means for a delivery date.
Was your order moved up to 9/20 or was that always your date
 

bradFORD

2.5L Hybrid
Well-known member
Joined
Jul 16, 2021
Threads
19
Messages
578
Reaction score
737
Location
Springfield, MO
Vehicle(s)
Ford Ranger
Engine
2.5L Hybrid
My understanding is that they are shipped by train to Kansas City. So depending how close or far away from there, will depend on trucking schedule to your dealer. I would expect that you would get yours by late October or early November.
 

Sponsored

Eagle11

2.5L Hybrid
Well-known member
Joined
Aug 6, 2021
Threads
17
Messages
1,948
Reaction score
1,645
Location
Valley of the Sun
Vehicle(s)
'07 Boxster S, 2018 BMW M5, Ducati's, Suzuki's
Engine
2.5L Hybrid
Clubs
 
My understanding is that they are shipped by train to Kansas City. So depending how close or far away from there, will depend on trucking schedule to your dealer. I would expect that you would get yours by late October or early November.
I'm betting they are going by rail to a distribution center then trucked, here in PHX we have one of those centers, and cars are dropped off by rail, then loaded onto trucks. It's a pretty cool set up they
 
Last edited:

Brian_J

2.0L EcoBoost
Well-known member
First Name
Brian
Joined
Jul 2, 2021
Threads
44
Messages
800
Reaction score
1,041
Location
Akron, Ohio
Vehicle(s)
'17 R6, HPR Maverick AWD 4K
Engine
2.0L EcoBoost
I'm betting they are going by rail to a distribution center then trucked, here in PHX we have one of those centers, and cars are dropped off by rail, then loaded onto trucks. It's a pretty cook set up they
Is t there one along side i95 in nj?
 

slashy42

Well-known member
Joined
Jun 16, 2021
Threads
9
Messages
352
Reaction score
758
Location
Texas
Vehicle(s)
2022 Ford Maverick
My dealer in north Texas said 2-3 weeks after production based on how long bronco sports took.
 

Packer Bill

2.0L EcoBoost
Well-known member
First Name
Bill
Joined
Jun 21, 2021
Threads
4
Messages
756
Reaction score
923
Location
South Dakota
Vehicle(s)
Mazda CX-5
Engine
2.0L EcoBoost
My friend ordered a Bronco Sport. It took 5.5 weeks to arrive after it was built.
 
Sponsored

potatosalad

2.5L Hybrid
Well-known member
Joined
Jul 26, 2021
Threads
1
Messages
60
Reaction score
62
Location
Los Angeles
Vehicle(s)
Toyota
Engine
2.5L Hybrid
Thanks for posting this OP. I was looking for the same info. Even though I don't have a build date I can mentally prepare myself for 6 weeks ± 2 weeks based on the responses on here.