Sponsored

Showing in production but the build date is 4/18

scudder

New member
First Name
Daniel
Joined
Feb 3, 2022
Threads
1
Messages
2
Reaction score
14
Location
Georgia
Vehicle(s)
c-max
Ordered my Maverick 1/22. Got a scheduled build date of 4/18. Got bored and checked the status and it says in production, no email and still can not see the window sticker. Just curious if I got lucky and it being built a few days early or if it is just a mistake on Fords system.
Ford Maverick Showing in production but the build date is 4/18 3A381997-0BC8-440D-BC8C-9B802513AD80
Sponsored

 

The Weatherman

2.0L EcoBoost
Well-known member
First Name
Dean
Joined
Jul 20, 2021
Threads
21
Messages
2,470
Reaction score
3,542
Location
KY
Vehicle(s)
2022 Maverick Lariat Lux FX4 4K x 2
Engine
2.0L EcoBoost
In production starts well before the truck actually starts down the line, but hey it’s always good to know your heading in the right direction.

That said, some have been surprised when their trucks got built ahead of schedule. It happens.

😊
 

Hypsypops

2.5L Hybrid
Well-known member
First Name
Desmond
Joined
Mar 3, 2022
Threads
6
Messages
57
Reaction score
142
Location
Santa Barbara, CA
Vehicle(s)
2022 XLT Hybrid, 2013 Ford Focus ST
Engine
2.5L Hybrid
I've had the same issue, it says in production but can't see the window sticker. My build week is 4/11 so I wonder if this batch they are just slow to upload the window sticker??
 

FriscoTXJoe

2.5L Hybrid
Banned
Banned
First Name
Joe
Joined
Aug 25, 2021
Threads
27
Messages
983
Reaction score
2,404
Location
75033
Vehicle(s)
2022 Maverick Lariat
Engine
2.5L Hybrid
Clubs
 
If you want to drive yourself completely crazy, keep checking it about 10-12 times a day. It doesn't move often but when it does?

SCHHHHHWWIIIIIIINNNNNNNNNGGGGGGGGGG!!!!


That's a good day.....
Sponsored

 
  • Like
Reactions: Aza
 







Top