Sponsored

Ordering a XLT HYBRID tomorrow 9-27

BoxxerDad@50

2.5L Hybrid
Well-known member
First Name
Kip
Joined
Sep 24, 2021
Threads
65
Messages
400
Reaction score
377
Location
Lees Summit MO
Vehicle(s)
MY25 XLT BAP XLT HYBRID SOLD MY 2023 XLT hybrid 2023 Lariat,MY22XLT
Engine
2.5L Hybrid
What are the chances this will be built in 4-6 months?

thoughts?
Sponsored

 

V2WIN

2.5L Hybrid
Well-known member
First Name
Ivan
Joined
Sep 6, 2021
Threads
8
Messages
146
Reaction score
223
Location
Illinois
Vehicle(s)
2022 Maverick XLT Hybrid
Engine
2.5L Hybrid
What are the chances this will be built in 4-6 months?

thoughts?
I honestly think once they get through these orders the builds will be 6 weeks or so like they were 5 years ago. I ordered a Subaru Forester in 2010 & like clock work 6 weeks later I was driving it. This micro chip deal can't go on forever. The big three are all making noise about making their own. Outsourcing to Vietnam, Thailand etc is biting them again.
 

Big_T

2.5L Hybrid
Well-known member
First Name
T
Joined
Jun 10, 2021
Threads
51
Messages
1,745
Reaction score
3,489
Location
North Carolina
Vehicle(s)
2022 Maverick XL Hybrid
Engine
2.5L Hybrid
What are the chances this will be built in 4-6 months?

thoughts?
4 months probably not but 6 months maybe....that's my best guess.
EDIT: You didn't say anything about luxury package or spray-in bedliner so I based my answer on that.
 
OP
OP
BoxxerDad@50

BoxxerDad@50

2.5L Hybrid
Well-known member
First Name
Kip
Joined
Sep 24, 2021
Threads
65
Messages
400
Reaction score
377
Location
Lees Summit MO
Vehicle(s)
MY25 XLT BAP XLT HYBRID SOLD MY 2023 XLT hybrid 2023 Lariat,MY22XLT
Engine
2.5L Hybrid
4 months probably not but 6 months maybe....that's my best guess.
EDIT: You didn't say anything about luxury package or spray-in bedliner so I based my answer on that.
Well I’m ordering the XLT WITH 360 and luxury
 

Sponsored

Big_T

2.5L Hybrid
Well-known member
First Name
T
Joined
Jun 10, 2021
Threads
51
Messages
1,745
Reaction score
3,489
Location
North Carolina
Vehicle(s)
2022 Maverick XL Hybrid
Engine
2.5L Hybrid
Well I’m ordering the XLT WITH 360 and luxury
The luxury package orders are scheduling something like 17 percent for now so it might be a while.
 

WesM

2.5L Hybrid
Well-known member
First Name
Wes
Joined
Jul 22, 2021
Threads
19
Messages
905
Reaction score
1,631
Location
Maryland USA
Vehicle(s)
Ford Maverick
Engine
2.5L Hybrid
Well you have a better chance of getting built in 4-6 months than the people who ordered in June, July or August, before production had even begun. I would be surprised if it takes longer than 4-6 months though, since they should have production going full blast (baring shortages) by the end of the year.
 
OP
OP
BoxxerDad@50

BoxxerDad@50

2.5L Hybrid
Well-known member
First Name
Kip
Joined
Sep 24, 2021
Threads
65
Messages
400
Reaction score
377
Location
Lees Summit MO
Vehicle(s)
MY25 XLT BAP XLT HYBRID SOLD MY 2023 XLT hybrid 2023 Lariat,MY22XLT
Engine
2.5L Hybrid
The luxury package orders are scheduling something like 17 percent for now so it might be a while.
That is understandable but since I’m ordering it I want to get it how I want to enjoy it. As long as the dealer holds with the trade they offer me… as I’ll get it in writing. I’ll have more down and owe less on my trade in….
Sponsored

 
 







Top