Sponsored

Multi-month delay for February 2022 deliveries - Why?

Michaelkov

2.5L Hybrid
Well-known member
First Name
Michael
Joined
Jun 22, 2021
Threads
9
Messages
456
Reaction score
986
Location
Atlanta, GA
Vehicle(s)
2021 BMW X1, 2018 Toyota Rav4, 2022 Ford Maverick
Engine
2.5L Hybrid
I wouldn't worry about the SIBL with UV fading because they are very hardy. The hybrid battery question is a good one.
Don't worry about the hybrid battery...they don't pull the tabs until the dealer prep.

Ford Maverick Multi-month delay for February 2022 deliveries - Why? Screenshot_20210724-135556_YouTube
Sponsored

 

SinnerSavedByGrace

Well-known member
First Name
James
Joined
Nov 18, 2021
Threads
0
Messages
74
Reaction score
85
Location
Dillsburg, PA
Vehicle(s)
2016 Ford Fusion
Just an update, I just got a "built" email from Ford.
It was actually built 1/13 with an ETA of 2/21 and went into Micro Chip hold, ETA pushed to 5/21.
New ETA is 2nd-3rd week of March.
Hopefully the rest of you get the same email soon!
 

MDR

2.5L Hybrid
Well-known member
First Name
MDR
Joined
Feb 25, 2022
Threads
0
Messages
79
Reaction score
28
Location
McDonough ga
Vehicle(s)
2022 ford honda
Engine
2.5L Hybrid
Eco boost built 1 31 expected del 3 19 ford del to changed to June 19
 

casanewt

Well-known member
Joined
Jul 22, 2021
Threads
9
Messages
465
Reaction score
656
Location
Cincinnati
Vehicle(s)
2023 KIA Sportage X-Line Prestige PHEV
Engine
Undecided
Eco boost built 1 31 expected del 3 19 ford del to changed to June 19
ETAs are pretty out-of-whack for those of us who had production dates in January during the chip hold. Have you seen a "built" or "shipped" email yet? My ETA was late Feb, then changed to late May, then got "built" and "shipped" and ETA changed to late March. It's on a train now.
 

MDR

2.5L Hybrid
Well-known member
First Name
MDR
Joined
Feb 25, 2022
Threads
0
Messages
79
Reaction score
28
Location
McDonough ga
Vehicle(s)
2022 ford honda
Engine
2.5L Hybrid
ETAs are pretty out-of-whack for those of us who had production dates in January during the chip hold. Have you seen a "built" or "shipped" email yet? My ETA was late Feb, then changed to late May, then got "built" and "shipped" and ETA changed to late March. It's on a train now.
No change still expected del 6 16
Sponsored

 
 




Top