Sponsored

Longest Wait Time From Confirmed Order to Delivery

4BoysMom

Active member
First Name
Danielle
Joined
Jan 10, 2022
Threads
4
Messages
35
Reaction score
70
Location
Marietta GA
Vehicle(s)
1983 F250, 1973 Camaro, 2022 Maverick, 2022 Mini
Not at my computer, but you can pull the data from the tracker and just dump into excel. Then just filter by max number of days between order to delivery.

maybe take you 30 seconds
I just checked on the status of mine again today. I ordered a First Edition Hybrid. Here's what it says so far:

Order Confirmed 6/17/21. In production 1/18/22. Delivery date of MAY 31!! Holy cow that is over 3 months after production will be completed that my Maverick will be delivered.
Sponsored

 

RonFetty

Well-known member
First Name
Ron
Joined
Jan 27, 2022
Threads
3
Messages
207
Reaction score
180
Location
Barbados
Vehicle(s)
92 Cummins Ram 5SP, 4-Runner TRDP, TDI DSG VW
I just checked on the status of mine again today. I ordered a First Edition Hybrid. Here's what it says so far:

Order Confirmed 6/17/21. In production 1/18/22. Delivery date of MAY 31!! Holy cow that is over 3 months after production will be completed that my Maverick will be delivered.
That means they started production then moved it to the holding lot as some parts of the truck were not available.

it’s positive, it means trucks will flow out faster once the missing modules get there
 

4BoysMom

Active member
First Name
Danielle
Joined
Jan 10, 2022
Threads
4
Messages
35
Reaction score
70
Location
Marietta GA
Vehicle(s)
1983 F250, 1973 Camaro, 2022 Maverick, 2022 Mini
That means they started production then moved it to the holding lot as some parts of the truck were not available.

it’s positive, it means trucks will flow out faster once the missing modules get there
Yes I was hoping the chip shortage would not affect once it was in production but I shouldve known better. My sister works for Ford plant in KY and she says they dont have enough space in Louisville to store all the trucks that are waiting on chips. They go into shutdown because they dont have the parts. She was even surprised I got my production date so I guess I'll be a truck sitting around in Mexico.
 

RonFetty

Well-known member
First Name
Ron
Joined
Jan 27, 2022
Threads
3
Messages
207
Reaction score
180
Location
Barbados
Vehicle(s)
92 Cummins Ram 5SP, 4-Runner TRDP, TDI DSG VW
Yes I was hoping the chip shortage would not affect once it was in production but I shouldve known better. My sister works for Ford plant in KY and she says they dont have enough space in Louisville to store all the trucks that are waiting on chips. They go into shutdown because they dont have the parts. She was even surprised I got my production date so I guess I'll be a truck sitting around in Mexico.
that sucks. Hope all goes smooth from here
 

Red Ryder

2.5L Hybrid
Well-known member
Joined
Jun 20, 2021
Threads
12
Messages
1,138
Reaction score
1,662
Location
United States (TN)
Vehicle(s)
22 Maverick XLT Iconic Silver
Engine
2.5L Hybrid
That means they started production then moved it to the holding lot as some parts of the truck were not available.

it’s positive, it means trucks will flow out faster once the missing modules get there
That is positive assuming that they prioritize the lot trucks before new production. That wasn't the case with Bronco Sports at Hermosillo. I hope this time its different.
 

Sponsored

AK ADQ

2.0L EcoBoost
Member
First Name
Leon
Joined
Aug 2, 2021
Threads
0
Messages
13
Reaction score
10
Location
Alaska
Vehicle(s)
2004 Jeep Liberty 2010 Dodge Journey
Engine
2.0L EcoBoost
Ordered on Fathers day in June on Ford website. Ford confirmed on 6-28. Received e-mail Mon 2-14 my mavie is in production. Received email Wed 2-16 was built. Received e-mail Fri 2-18 my mavie was shipped. Email said it should reach dealer by 3rd week of March. By the time it reaches me will be Late March. About nine months from order to dealer than to me. Not close to nearest dealer have to have it shipped by ocean barge.
 

XLTLUXRED

2.5L Hybrid
Well-known member
First Name
JM
Joined
Oct 13, 2021
Threads
4
Messages
1,221
Reaction score
2,230
Location
Vermont
Vehicle(s)
Maverick hybrid, Mini 4 door
Engine
2.5L Hybrid
See my signature.

Long wait. Confirmed 6/14. Was on chip hold, but is now enroute. Delivery expected March 23-29. So, the truck will take about as much time as our 4th child, who was born 14 days post due date. At least, with the waiting for our son, we didn't actually know he existed for a few months. LOL.
 

New2AZ

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Aug 9, 2021
Threads
10
Messages
814
Reaction score
1,491
Location
Scottsdale, AZ
Vehicle(s)
2019 Civic EX Hatchback
Engine
2.5L Hybrid
I technically ordered 7/28/22 (confirmed 3 days later) and took delivery 2/28/23 so I'll call it an even 7 months. Worth it!
 
Sponsored

j1truck

2.5L Hybrid
Well-known member
Joined
Jul 8, 2021
Threads
12
Messages
78
Reaction score
36
Location
San Jose, CA
Vehicle(s)
EGolf
Engine
2.5L Hybrid
So I've ordered my XLT Maverick and got confirmation on 8/7. In Oct, I've switched to Lariat Maverick. My dealer said my order # and everything is exactly the same at that time. I've called the FoMoCo yesterday and ask if there's any issue with my reservation/hold and she said that I should expect a VIN number in 2 weeks. Is this true or a comment response from them?
 

941MavXLT

2.0L EcoBoost
Member
First Name
Mike
Joined
Feb 28, 2022
Threads
2
Messages
16
Reaction score
7
Location
Sarasota
Vehicle(s)
XLT EB
Engine
2.0L EcoBoost
So I've ordered my XLT Maverick and got confirmation on 8/7. In Oct, I've switched to Lariat Maverick. My dealer said my order # and everything is exactly the same at that time. I've called the FoMoCo yesterday and ask if there's any issue with my reservation/hold and she said that I should expect a VIN number in 2 weeks. Is this true or a comment response from them?
I’m not sure how they can accurately say “you’ll get a VIN and build date in 2 weeks” as seen by this forum.

also in October you set yourself at the back of the “line” again by changing your trim level so consider that your new order date.

covered many times in fords statements, dealer statements, and fordvideoguy videos that changing your trim level and ordered package level (100/200/300a) will reset you.
 

Vols44

2.5L Hybrid
Well-known member
Joined
Sep 19, 2021
Threads
0
Messages
731
Reaction score
700
Location
Missouri
Vehicle(s)
2018 Edge
Engine
2.5L Hybrid
I’m not sure how they can accurately say “you’ll get a VIN and build date in 2 weeks” as seen by this forum.

also in October you set yourself at the back of the “line” again by changing your trim level so consider that your new order date.

covered many times in fords statements, dealer statements, and fordvideoguy videos that changing your trim level and ordered package level (100/200/300a) will reset you.
I agree, j1truck's new order date is 11-15 or 1-27.
 

Delzona

2.5L Hybrid
Well-known member
First Name
Chris
Joined
Jul 3, 2021
Threads
11
Messages
4,378
Reaction score
9,209
Location
Tucson, AZ
Vehicle(s)
15 Breakout, 21 Road King Special, 22 Maverick XLT
Engine
2.5L Hybrid
So I've ordered my XLT Maverick and got confirmation on 8/7. In Oct, I've switched to Lariat Maverick. My dealer said my order # and everything is exactly the same at that time. I've called the FoMoCo yesterday and ask if there's any issue with my reservation/hold and she said that I should expect a VIN number in 2 weeks. Is this true or a comment response from them?
You should call Ford Customer Service and ask them what date they have for your order because it could've got reset to when you made the trim change in October. Also the, expect your VIN in 2 weeks" is a stock answer they give. Unless you have a build date you won't get a VIN.
Sponsored

 
 




Top