Doing some rough math it looks like most non-XL EcoBoost orders should build out by April. Hybrids and XLs extending out to July+.
Sponsored

 

1SgtDavo

2.0L EcoBoost
Active member
First Name
Dave
Joined
Jan 10, 2024
Threads
2
Messages
28
Reaction score
22
Location
Washington
Vehicle(s)
Maverick, XL 2.0 Eco
Engine
2.0L EcoBoost
Clubs
 
interesting
 

Bill Quattlebaum

2.0L EcoBoost
Well-known member
First Name
Bill
Joined
Jan 4, 2023
Threads
27
Messages
698
Reaction score
849
Location
Blackville, SC
Vehicle(s)
2024 Maverick XL, Ecoboost 2.0
Engine
2.0L EcoBoost
No need for Ford to do that.

Ford will build current XL orders and future orders this year.

It will just take some time as Ford prioritizes XLT/Lariat orders.

Ford specifically stated that XL orders would be constrained even before the 2024 order banks opened.

I see no reason for the complaints on scheduling XLs as this information was published before the order banks opened and even dealers told customers to expect a long time from order to delivery on XL orders.
If you had been waiting 478 days, you might complain, also. When I ordered in September of 2022, nobody told me that an XL was constrained. I even switched from hybrid to ecoboost when Ford said I would have a better chance of getting a truck. It stinks seeing people getting trucks in 6 months or less, when some of us have been waiting 16 to 24 months or more to get a vehicle.