Sponsored

Lariat Build Schedule

Ttrainor8

2.5L Hybrid
New member
First Name
Tom
Joined
Mar 4, 2025
Threads
1
Messages
1
Reaction score
0
Location
Maine
Vehicle(s)
2025 Ford Maverick Lariat
Engine
2.5L Hybrid
My Lariat was scheduled to be built the week of 3/17. When checking on it states "in production" last update was 3/21. I was under the impression it took a day to build a truck. Anyone know how long this takes?
Sponsored

 

scottjl

2.5L Hybrid
Well-known member
Joined
Jan 8, 2025
Threads
12
Messages
454
Reaction score
966
Location
Midwest USA
Vehicle(s)
'25 Lariat Eruption Green, 4k, BAP
Engine
2.5L Hybrid
Clubs
 
going to depend on options, BAP, moonroof, and the spray-in-liner (standard on lariat) all add time. i had the same schedule week as you, but it went into production a week early and only finished build this week, about 12 days total. i think any QC checks also count under "in production" as well. after build was complete it still took 48 hours before it shipped.

hopefully you'll be seeing it soon!
 

pestojest

2.5L Hybrid
Member
Joined
Mar 11, 2025
Threads
0
Messages
23
Reaction score
13
Location
Maryland
Vehicle(s)
2025 Lariat
Engine
2.5L Hybrid
See here (along with several other threads): https://www.mavericktruckclub.com/forum/threads/built.62866/

The tl;dr is that yeah, it def takes more than a day and regardless of how long it actually takes, the tracker isn't really that precise. It only gets updated periodically and it often shows bad/outdated info before correcting itself later.

It's fine for having a rough idea of where your truck is in the process, but don't expect a very accurate play-by-play. Cheers.
 

Schaal701

2.5L Hybrid
Active member
First Name
Alan
Joined
Jan 25, 2025
Threads
1
Messages
32
Reaction score
64
Location
Sedona AZ
Vehicle(s)
Maverick Lariat AWD Hybrid - 2025
Engine
2.5L Hybrid
Mine had "Production" in bold without a date for about 1 week, then a 3/25 date on the "Production " line with a "Built" date of 3/26.
 

Sponsored

DefiantDJ

2.5L Hybrid
Well-known member
First Name
Doris
Joined
Jan 16, 2025
Threads
6
Messages
63
Reaction score
56
Location
Michigan
Vehicle(s)
2024 Maverick Hybrid XLT
Engine
2.5L Hybrid
Mine had "Production" in bold without a date for about 1 week, then a 3/25 date on the "Production " line with a "Built" date of 3/26.
Courius when you placed your order?
 

DefiantDJ

2.5L Hybrid
Well-known member
First Name
Doris
Joined
Jan 16, 2025
Threads
6
Messages
63
Reaction score
56
Location
Michigan
Vehicle(s)
2024 Maverick Hybrid XLT
Engine
2.5L Hybrid
My Lariat was scheduled to be built the week of 3/17. When checking on it states "in production" last update was 3/21. I was under the impression it took a day to build a truck. Anyone know how long this takes?
Can you tell me what your order date was?
 

sme1974

2.5L Hybrid
Member
First Name
Steve
Joined
Nov 26, 2024
Threads
3
Messages
20
Reaction score
10
Location
Conyers, GA
Vehicle(s)
2025 Maverick Lariat Hybrid
Engine
2.5L Hybrid
Ordered mine 1/31/25, here's current status.
Ford Maverick Lariat Build Schedule Screenshot 2025-03-27 234551
 

DefiantDJ

2.5L Hybrid
Well-known member
First Name
Doris
Joined
Jan 16, 2025
Threads
6
Messages
63
Reaction score
56
Location
Michigan
Vehicle(s)
2024 Maverick Hybrid XLT
Engine
2.5L Hybrid
Ordered mine 1/31/25, here's current status.
Screenshot 2025-03-27 234551.webp
We placed our order for the Lariat 1/28/2025.

The most we have seen was a message on 3/17/2025 saying they were working on your scheduled build date.

Really wanted the truck built before tariffs kicked in.... but still in limbo... sigh
 
Sponsored

sme1974

2.5L Hybrid
Member
First Name
Steve
Joined
Nov 26, 2024
Threads
3
Messages
20
Reaction score
10
Location
Conyers, GA
Vehicle(s)
2025 Maverick Lariat Hybrid
Engine
2.5L Hybrid
We placed our order for the Lariat 1/28/2025.

The most we have seen was a message on 3/17/2025 saying they were working on your scheduled build date.

Really wanted the truck built before tariffs kicked in.... but still in limbo... sigh
Got another update this morning that it has shipped. Hoping they weren't rushing it through just to beat the tariffs possibly resulting in a bad build!! Only three days from production to shipped? Haven't seen anything on this forum with that short of a time period!
Ford Maverick Lariat Build Schedule Screenshot 2025-03-28 050228
 

Troggis

2.5L Hybrid
Member
First Name
John
Joined
Oct 8, 2024
Threads
0
Messages
9
Reaction score
6
Location
Wyoming
Vehicle(s)
2025 Hybrid Lariat, 4k Tow Pkg
Engine
2.5L Hybrid
Got another update this morning that it has shipped. Hoping they weren't rushing it through just to beat the tariffs possibly resulting in a bad build!! Only three days from production to shipped? Haven't seen anything on this forum with that short of a time period!
Screenshot 2025-03-28 050228.webp



Mine was built in 2 days, luckily not a Monday or Friday 😂
Ford Maverick Lariat Build Schedule Screenshot_20250320_103938_Chrom
Sponsored

 
 







Top