Sponsored

Fastest Delivery Times

NJ Pinelands

2.5L Hybrid
Well-known member
Joined
Oct 31, 2021
Threads
187
Messages
2,212
Reaction score
2,674
Location
New Jersey
Vehicle(s)
Chevrolet
Engine
2.5L Hybrid
Just wondering if any of you received your Maverick in under a month after it was built. I am supposed to have my Chevy Colorado inspected in September and have a build date of September 12. I could take a chance and see if I could trade it in without a recent inspection, but was hoping I have a slight chance mine is shipped from Mexico to the New Jersey Pinelands by September 30. And yes, I know my XL base hybrid build date could be changed at any time. Still, do I have any shot at all for an 18 day delivery?
Sponsored

 

WannaMav

2.5L Hybrid
Well-known member
Joined
Oct 9, 2021
Threads
78
Messages
902
Reaction score
1,403
Location
Hawaii
Vehicle(s)
2022 Maverick hybrid
Engine
2.5L Hybrid
Magic 8-ball says: "18 days? Beyond unlikely."

Less flippantly, there's a chance it will sit at the factory for days or a week when build is completed before being loaded onto a train for transport. Also, if you have any options which need to be installed at what is called the Body Shop (as opposed to the Build Shop), that could eat up some more days prior to shipping - for example, SIBL is done post-build at the Body Shop.
 

Ron Neal

2.0L EcoBoost
Well-known member
First Name
Ron
Joined
Apr 4, 2021
Threads
24
Messages
808
Reaction score
1,187
Location
SC
Vehicle(s)
Sold Ranger
Engine
2.0L EcoBoost
Once built Ford will give you a expected delivery window which may be shorter than the 30 days (or not). I also have a Sep build date but its the week of 12 Sep. Guessing very little chance of getting it by 30 Sep. Hope it gets to you asap.
 

The Weatherman

2.0L EcoBoost
Well-known member
First Name
Dean
Joined
Jul 20, 2021
Threads
21
Messages
2,470
Reaction score
3,542
Location
KY
Vehicle(s)
2022 Maverick Lariat Lux FX4 4K x 2
Engine
2.0L EcoBoost
Yes, both of them.

1st built in n Oct, 2021 and was delivered Nov.3,2021

2nd was built in April, 2022 and was delivered May 27, 2022
 

MLowe05

2.5L Hybrid
Well-known member
Joined
Oct 1, 2021
Threads
8
Messages
2,494
Reaction score
4,367
Location
GA
Vehicle(s)
2024 XLT Hybrid & 2024 Tesla M3P
Engine
2.5L Hybrid
Oh you have a shot, but the question is.. do you feel lucky?

Our XL EB arrived in about 3 weeks from the plant in MX to Long McArthur. But then Tim the other night on his video said one had been sitting in, I believe, Kansas City since April and still hasn't made it there.

I'd hold on to whatever you have now until you get your hands on the Mav.
 

Sponsored

NJBob

2.0L EcoBoost
Well-known member
First Name
Bob
Joined
Dec 25, 2021
Threads
139
Messages
2,391
Reaction score
1,579
Location
New Jersey
Vehicle(s)
2022 Maverick, 2003 MR2, 2019 Forrester, 1969 Z/28
Engine
2.0L EcoBoost
Just wondering if any of you received your Maverick in under a month after it was built. I am supposed to have my Chevy Colorado inspected in September and have a build date of September 12. I could take a chance and see if I could trade it in without a recent inspection, but was hoping I have a slight chance mine is shipped from Mexico to the New Jersey Pinelands by September 30. And yes, I know my XL base hybrid build date could be changed at any time. Still, do I have any shot at all for an 18 day delivery?
As long as you don't have a check engine light it will pass NJ inspection. All they care about is emissions. I live in rural area in NW NJ. And if you go in the middle of the month maybe one or two cars ahead of you. Congrats on being scheduled.
 

Portcqb

2.5L Hybrid
Well-known member
First Name
Eric
Joined
Aug 9, 2021
Threads
14
Messages
512
Reaction score
570
Location
South Portland, ME
Vehicle(s)
2025 Ford Maverick Lariat Hybrid AWD
Engine
2.5L Hybrid
Mine shipped 12/21 and was delivered 1/6 to Maine
 

Renho17

2.5L Hybrid
Well-known member
First Name
Ren
Joined
Aug 12, 2021
Threads
1
Messages
464
Reaction score
533
Location
CA
Vehicle(s)
Hybrid Mav
Engine
2.5L Hybrid
18 days to east coast, no way.
 
 







Top