- First Name
- Todd
- Joined
- Jun 18, 2021
- Threads
- 2
- Messages
- 15
- Reaction score
- 12
- Location
- Weirton, WV
- Vehicle(s)
- 20 Camry xse, 05 Mustang, 15 Cruze LT
- Thread starter
- #1
Hi everyone. I have a question. I have a confirmed order from 6/14 for a Lariat, 2.0, Luxury Package, and FX4 in Hot Pepper Red. The only standalone item I added was the soft tri-fold tonneau cover. Although it has been at Priority 2 for three weeks, I have not gotten a Production date as of yet. I have seen many builds almost identical to mine get scheduled, even with order dates into July and August. The question I have is, even though I have not seen it, could the tonneau cover be what is causing the delay on mine being scheduled? Everything else on my build are packages. I am afraid that if it doesn't get scheduled this week then it won't be delivered until winter and I have sold my 4x4 Frontier and only have a Mustang to drive and would rather not drive it on icy/snowy/salty roads. Did anyone that did get scheduled have the soft tonneau on their build? And is Tuesday too late to get a change in for Thursday scheduling? Thanks.
Sponsored