Sponsored

Did anyone hear that Black Appearance Package is no longer available for a change order?

Gene Ab

2.5L Hybrid
Member
First Name
Gene
Joined
Sep 20, 2022
Threads
4
Messages
13
Reaction score
20
Location
Brooksville, FL
Vehicle(s)
Maverick XLT - Hybrid, Polestar 2, Jeep Wrangler
Engine
2.5L Hybrid
Hi Maverick fans, I heard that we are no longer able to order or add on a black appearance package. Has anyone heard the same?
Sponsored

 

AGW078

2.0L EcoBoost
Well-known member
First Name
Andrew
Joined
Sep 17, 2022
Threads
7
Messages
149
Reaction score
154
Location
Mississippi
Vehicle(s)
23' Maverick Lariat Tremor
Engine
2.0L EcoBoost
Clubs
 
Hi Maverick fans, I heard that we are no longer able to order or add on a black appearance package. Has anyone heard the same?
BAP should still be able to be ordered on EB XLTs and Lariats until they close the order bank tomorrow night at 10pm EDT.
 

wblynch

2.5L Hybrid
Active member
First Name
Will
Joined
Aug 27, 2022
Threads
1
Messages
41
Reaction score
36
Location
OC, CA
Vehicle(s)
Ram 1500
Engine
2.5L Hybrid
Tried to order a hybrid xlt with black package today. Salesman said system wouldn’t allow it but put notes on the order and said we can update it soon. Confirmation of the order from Ford came through with no mention of the BAP. I really want the package but it seems a crapshoot if I’ll get it. Time will tell.
Sponsored

 
 







Top