- First Name
- Gene
- Joined
- Sep 20, 2022
- Threads
- 4
- Messages
- 13
- Reaction score
- 20
- Location
- Brooksville, FL
- Vehicle(s)
- Maverick XLT - Hybrid, Polestar 2, Jeep Wrangler
- Engine
- 2.5L Hybrid
- Thread starter
- #1
Hi Maverick fans, I heard that we are no longer able to order or add on a black appearance package. Has anyone heard the same?
Sponsored