Sponsored

Delivery times?

Vineserf

Member
First Name
Steve
Joined
Jul 14, 2026
Threads
3
Messages
11
Reaction score
14
Location
Templeton, CA
Vehicle(s)
2020 Outback, 2015 Silverado, 1969 MGB
Engine
Undecided
The Maverick I ordered on July 22 (Lariat AWD, hybrid) is scheduled to built on Sept 2, but isn't due to be delivered until the 1st week in Nov? I'm on the west coast, central CA. What have been the post-build delivery times for those on the west coast?

Thanks
Sponsored

 

Gray Goose

2.0L EcoBoost
Well-known member
First Name
RG
Joined
Jul 14, 2023
Threads
21
Messages
1,073
Reaction score
1,931
Location
Wissota
Vehicle(s)
Maverick XL 2024, Escape 2012, GMC Terrain 2017
Engine
2.0L EcoBoost
Clubs
 
There could be delays with the process between build and delivery. Here are some that are highly variable.
Spray in bed liner - this is a separate production line that starts some period of time after build completion.
QA inspections
Availability of transport units. Car haulers and drivers are limited supply.
 

Fender66

2.5L Hybrid
Well-known member
First Name
Scott
Joined
Sep 8, 2025
Threads
5
Messages
90
Reaction score
186
Location
Charlotte NC
Vehicle(s)
2025 Maverick Lariat
Engine
2.5L Hybrid
I ordered my hybrid Lariat in March 2025 and took delivery in August. The delay for my build was due to some recalls that had to be resolved before production could start.
 

Larrythelunatic

2.5L Hybrid
Well-known member
First Name
Larry
Joined
Sep 7, 2021
Threads
9
Messages
771
Reaction score
897
Location
Massachusetts
Vehicle(s)
92 Toyota Pickup. 22 IS hybrid Maverick. ‘25 Hybrid RAV4
Engine
2.5L Hybrid
Clubs
 
Got your VIN?
Google the number.
Once mine was built, I regularly googled the VIN, just about daily. Had no other updates.
One day it showed up as on its way from the railhead, with other Ford vehicles.
 
OP
OP

Vineserf

Member
First Name
Steve
Joined
Jul 14, 2026
Threads
3
Messages
11
Reaction score
14
Location
Templeton, CA
Vehicle(s)
2020 Outback, 2015 Silverado, 1969 MGB
Engine
Undecided
Thanks folks.
 

F150 2.7 TT user

2.0L EcoBoost
Well-known member
First Name
Kenneth
Joined
Jun 10, 2026
Threads
4
Messages
180
Reaction score
317
Location
SE WI
Vehicle(s)
2026 Maverick Tremor, 2017 F150 XL 2.7
Engine
2.0L EcoBoost
Ordered new build Tremor end of Feb. 2026. Build start scheduled for June 8. Delivered July 3. 4 mounths and a few days.
The shipped date on the Ford website was very pessimistic scheduled for mid August delivery. So our Tremor arrived more than a month early.
Sponsored

 
 







Top