December 19 build date

JimJayJim

2.0L EcoBoost
Member
First Name
James
Joined
Dec 7, 2021
Threads
4
Messages
22
Reaction score
14
Location
Long Island, NY
Vehicle(s)
2017 Expedition
Engine
2.0L EcoBoost
Ordered October 27, 2021. Ordered again September 19, 2022. I finally got the scheduled for production email. I honestly never thought it would come. Maybe I'll get it by late spring

White Lariat lux
Fx4, tow, Co pilot 360 assist, remote start.
Sponsored

 

lsudelts

2.0L EcoBoost
Well-known member
First Name
Wendell
Joined
May 15, 2022
Threads
1
Messages
56
Reaction score
67
Location
Louisiana
Vehicle(s)
Ford Maverick (Build Week 12/19), Ford Focus SE
Engine
2.0L EcoBoost
I ordered Dec 14, 2022 and then early morning opening day for MY23. I received an email today for a December 19 week build. I ordered an XLT Luxury Package with a full size spare. I will do after market for the rest of the stuff I want.
 

RonFLA

2.5L Hybrid
Well-known member
First Name
Ron
Joined
Nov 23, 2021
Threads
12
Messages
741
Reaction score
1,125
Location
O-Town
Vehicle(s)
Maverick
Engine
2.5L Hybrid
Clubs
 
Hybrid XL, CP360. 11/15/22 rollover to 09/17/23. Scheduled for Dec. 19.
Ford Maverick December 19 build date F0AC7841-26D7-494D-A5CC-CBC2459B42F5
 

Batman

2.5L Hybrid
Member
First Name
Tyler
Joined
Oct 9, 2021
Threads
3
Messages
21
Reaction score
24
Location
NoVA
Vehicle(s)
23-Mav, 17-Golf, 01-325i, 97-Escort Wagon
Engine
2.5L Hybrid
Our trucks could be build date twins.

Area 51 XLT Lux with Copilot 360, remote start, power moonroof, and a block heater.

Ordered with Granger Ford 10/8/21, then again on 9/19/22. Looks like truck will get its first shakedown with a winter road trip.

Ford Maverick December 19 build date 1667519220855