- Thread starter
- #1
I am operating under the assumption that my 2022 Maverick (ordered October 21) will not be built. I am at peace with this.
I am also operating under the assumption that Ford will not be able to complete my replacement orders for 2023 and 2024 either, because Ford will still be short microchips.
What I really need is my 2025 Maverick. However, Intel's semiconductor plant is having some construction problems.
https://www.oregonlive.com/silicon-...l-factories-amid-historic-labor-shortage.html
If anyone is in the construction industry, please report to Johnstown, Ohio. We need our microchips!
I am also operating under the assumption that Ford will not be able to complete my replacement orders for 2023 and 2024 either, because Ford will still be short microchips.
What I really need is my 2025 Maverick. However, Intel's semiconductor plant is having some construction problems.
https://www.oregonlive.com/silicon-...l-factories-amid-historic-labor-shortage.html
If anyone is in the construction industry, please report to Johnstown, Ohio. We need our microchips!
Sponsored